Similar Projects
Central Division - Asphalt Paving Maintenance
Post-Bid

2021 Thermoplastic Lane Marking Material & Labor
Term Contract
Post-Bid

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Parking Improvements at the Quincy Maintenance Yard / Sign Shop Parking Lot
Results
IL

Water Main Improvements
Infrastructure
Post-Bid

2020 MFT Maintenance - Asphalt Resurfacing
Results
Less than $1,209,945 est. value
Quincy, IL 62301

Road Patching
Results
IL

Phase 1 LTCP Maximization
Renovation, Demolition
Results
Quincy, IL 62301

2020 Water Main Extension
Renovation
Results
Less than $420,000 est. value
Quincy, IL 62301

2020 Sewer Rehab/Grouting
Renovation
Results
Less than $130,312 est. value
Quincy, IL 62301

Ramp Construction
New Construction
Results
Less than $2,421,144 est. value

2019 Bond Projects - Phase 2
Renovation
Results
Less than $8,311,066 est. value
Quincy, IL

Resurfacing, Sidewalk Replacement, Curb and Gutter Replacement and Pavement Markings
Results
Quincy, IL 62301

8.7 Miles of Hma Removal and 2 Pass Micro-Surfacing on I-172 from IL 96 to US 24, East of Quincy
Results
Quincy, IL

Sealing the Decks, Parapets and Concrete Bridge Approach Pavement on Various Structures throughout District 6
Results

Last Updated 11/10/2021 01:56 PM
Project Title

Monroe Street - South 16th to South 18th

Physical Address View project details and contacts
City, State (County) Quincy, IL   (Adams County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Storm/Sewers, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $886,376
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project consists of 832 tons of hot mix asphalt, 2644 FT of PCC curb & gutter, 7468 SF PCC sidewalk, 827 SY of PCC driveways, 470 FT of 6 inch water main, 389 FT of storm sewers, and related improvements.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents