Similar Projects
Water Pollution Control Facility (WPCF) Lift Station Pump Controls - Phase 2 - E-11 - Town Of Amherst
Demolition, New Construction, Infrastructure
Conception
$1,200,000 CJ est. value
Buffalo, NY 14228

RFP - Intermunicipal Water Storage Study
Term Contract
Conception
Poughkeepsie, NY 12601

Marcellus Park Pump Station Improvement Program
Renovation
Design
$1,000,000 CJ est. value
Marcellus, NY 13108

Pine Bush Pump Station Renovations - 18903 Second Tranche - City of Albany
Renovation
Design
$600,000 CJ est. value
Albany, NY 12207

Taft Heights and Hooper Road Pump Stations - General
Renovation
Bidding
$400,000 CJ est. value
Town of Union, NY 13760

1,4 - Dioxane, PFOA and PFOS Treatment at Well 3A (Hollow Court)
New Construction, Infrastructure
Bidding
$200,000 CJ est. value
Albertson, NY 11507

Sanitary Sewer Pump Station and Force Main Improvements
New Construction, Demolition, Infrastructure
Post-Bid
$6,843,000 est. value
Binghamton, NY

Alpine Court, Barr More Hill, Jill Lane, and Mayfield Street Pump Station Improvements
Renovation
Post-Bid
Congers, New City, Valley Cottage, NY 10920

Central Avenue Pump Station
New Construction, Infrastructure
Results
Rye, NY 10580

Dinmore Road WWTP and Rockefeller Road Pump Station Bar Screen Replacement
Renovation
Results
$2,100,000 est. value
Delmar, Selkirk, NY 12158

Sanitary Wastewater Pump Station Upgrades General Construction
Renovation
Construction
Saratoga Springs, NY

GC Phase 2 Water Supply Contract 3C and 3D: Golden Road Pump Station
Renovation
Construction
NY

North Yonkers Pumping Station SSD - Westchester County
Infrastructure
Pending Verification
$6,000,000 CJ est. value
Yonkers, NY 10701

Bronx Valley SSD Pumping Station
Infrastructure
Pending Verification
$1,500,000 CJ est. value
White Plains, NY 10601

Wastewater Facilities Security Improvements - 35117 - Nassau County
Renovation
Conception
$3,276,000 CJ est. value
N Merrick, NY 11566

Last Updated 05/16/2023 10:07 AM
Project Title

Contract No. 13 and 14 Pump Station and Electrical/Instrumentation and Control Re-Phase 3

Physical Address View project details and contacts
City, State (County) Rome, NY 13440   (Oneida County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids
Project Status Results, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $3,738,101 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

As of May 16,2023, this project has not yet been awarded. A timeline for award has not yet been established. The Work ofthis Contract consists primarily of : Construction ofamasonry building with concrete masonry units/brick façade, concrete plank/PVC roofing, excavation/shoring/dewatering, concrete foundation, painting; doors; roof hatches; 8, 12 and 16-inch diameter ductile iron water main; drainage improvements (pipe and drainage inlets); mechanical piping; chemical feed system; booster pumps; meters; valves; dehumidifier; chlorine analyzer; site work; miscellaneous work and site restoration. The work ofContract No. 14 -Electrical/Instrumentation and Control - Re-Phase 3, is generally described as follows: underground electric, data and telephone service from existing utility poles to: pump station building (Turin Road); PRV vault sites (Link Road/West Thomas Street); meter/valve vault site (Routes 46/49); and tank site (Sunset Lane) including grounding; pump station/tank site building electrical system including electric/data/telephone service entrance, disconnect, automatic transfer switch (pump station site only), lighting, branch circuits, electrical connections to all equipment/valves; grounding; tank pedestal; PRV vault pedestal; meter/valve vault pedestal; generator (pump station site only); lightning protection system; instrumentation and control equipment including wiring/conduit; restoration and miscellaneous work. The opinion of probable construction cost is as follows: Contract No. 13 - $2,500,000.00 Contract No. 14 - $1,000,000.00 Bid Result. Contract No. 13 - Pump Station: C.O. Falter Construction Corp. $2,229,101.00 Contract No. 14 - Electrical: Hewitt Young Electric, LLC $1,509,000.00

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents