Project Title | Contract No. 13 and 14 Pump Station and Electrical/Instrumentation and Control Re-Phase 3 |
Physical Address | View project details and contacts |
City, State (County) | Rome, NY 13440 (Oneida County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Lift and Pump Stations |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected June 2023 |
Bids Due | View project details and contacts |
Estimated Value | $3,738,101 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | As of May 16,2023, this project has not yet been awarded. A timeline for award has not yet been established. The Work ofthis Contract consists primarily of : Construction ofamasonry building with concrete masonry units/brick façade, concrete plank/PVC roofing, excavation/shoring/dewatering, concrete foundation, painting; doors; roof hatches; 8, 12 and 16-inch diameter ductile iron water main; drainage improvements (pipe and drainage inlets); mechanical piping; chemical feed system; booster pumps; meters; valves; dehumidifier; chlorine analyzer; site work; miscellaneous work and site restoration. The work ofContract No. 14 -Electrical/Instrumentation and Control - Re-Phase 3, is generally described as follows: underground electric, data and telephone service from existing utility poles to: pump station building (Turin Road); PRV vault sites (Link Road/West Thomas Street); meter/valve vault site (Routes 46/49); and tank site (Sunset Lane) including grounding; pump station/tank site building electrical system including electric/data/telephone service entrance, disconnect, automatic transfer switch (pump station site only), lighting, branch circuits, electrical connections to all equipment/valves; grounding; tank pedestal; PRV vault pedestal; meter/valve vault pedestal; generator (pump station site only); lightning protection system; instrumentation and control equipment including wiring/conduit; restoration and miscellaneous work. The opinion of probable construction cost is as follows: Contract No. 13 - $2,500,000.00 Contract No. 14 - $1,000,000.00 Bid Result. Contract No. 13 - Pump Station: C.O. Falter Construction Corp. $2,229,101.00 Contract No. 14 - Electrical: Hewitt Young Electric, LLC $1,509,000.00 |
||||||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |