Similar Projects
Air Conditioning and Quality Improvements Package 5 - 2022 Bond - Lansing School
Alteration
Design
$4,100,000 est. value
Lansing, MI 48933

HVAC Equipment Replacements - Emmet County Sheriff Road Patrol Building
Renovation
Bidding
$2,750,000 CJ est. value
Harbor Springs, MI 49740

Boiler Replacement
Renovation
Sub-Bidding
$400,000 CJ est. value
Bay City, MI 48708

Department of Correction - Chiller Replacement - Central Region
Renovation
Sub-Bidding
$800,000 CJ est. value
Grand Rapids, MI 49503

2021 Bond Program - Bid Package 01 Elementary HVAC Upgrades
Alteration
Post-Bid
Oak Park, MI

2022 Riley and Eureka Elementary Cooling Project
Alteration
Post-Bid
Dewitt, Saint Johns, MI 48820

HVAC Controls Systems
Alteration
Results
Lansing, MI

Lessenger Early Childhood HVAC Renovations
Alteration
Results
Oak Park, MI

Pool Dehumidification AHU Replacement
Renovation
Pending Verification
$2,200,000 CJ est. value
Allegan, MI 49010

2023 Unit Vent Replacement
Renovation
Sub-Bidding
$650,000 CJ est. value
North Adams, MI 49262

Replace Existing Unit Ventilators
Alteration
Post-Bid
Battle Creek, MI

HVAC Cooling Design for Attwood School
Alteration
Results
Lansing, MI 48933

RFP - HVAC Updates
Renovation
Sub-Bidding
$100,000 CJ est. value
Grand Rapids, MI 49508

Adrian Summer 2022 Mechanical Upgrades And Facility Improvements
Alteration
Post-Bid
Adrian, MI

PT SM Duct Cleaning 21
Alteration
Results
Bay City, MI 48708

Last Updated 05/02/2023 10:05 AM
Project Title

Temperature Control Upgrade-MacDonald Elementary

Physical Address View project details and contacts
City, State (County) Casco, MI 48064   (Saint Clair County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Construction Commenced, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $27,500 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Bid was awarded to Metro Controls. Work is beginning today, May 1st with a project completion within 2 weeks. Any questions regarding the bid documents should be directed to the Anchor Bay School District Maintenance Department at (586) 716-3622. Scope Of Work AHU 4 Mount panel Build panel & mount controllers Controls installation of devices, valves, actuators. Wire controllers using existing control wiring at existing control panel (extend in new panel where necessary) Install communication wire Tap existing network Mount new transformers on side of new panel, pull transformer wiring from existing transformer box Install new space sensors (reuse existing space sensor wiring and location) Provide labor and material for the above scope Controls to be installed Single zone AHU with HW & CHW SE6166sp (6) reheat coils SE6166 sp ZS2PL-ALC (2) Fan Enable (2) 2 Fan Status (3) Damper actuators control existing Pump Relay (2) Smoke Detector Termination HW Coil Valve Control CHW Coil Valve Control ZS2PL-ALC Radiant Wall Panel ZS2PL-ALC

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents