Similar Projects
Vermilion East Pier Repair
Design
$1,000,000 to $2,000,000 est. value
Vermilion, OH

Cincinnati Riverfront Boat Dock
Infrastructure
Bidding
Cincinnati, OH

WMC Loading Dock Expansion and Renovation
Renovation
Post-Bid
Columbus, OH

Knox Lake Boating Access Improvements
Post-Bid
OH

Loveland Madeira Road Pier Wall 2019
Results
Less than $186,935 est. value
Cincinnati, OH

2019 Straight Creek Pier Walls
Results
Less than $303,670 est. value
Georgetown, OH

Muskingum Valley Park District, Wildlife Viewing Platform
Results
Less than $20,000 est. value
Zanesville, OH 43702

Zepernick Lake Boat Ramp Improvements
Results
$303,278 est. value
Columbus, OH

Wilmington Road Drilled Pier Wall Project
Results
Lebanon, OH

Construction Managment and Inspection Griggs Boat Launch
Results
Less than $1,327,145 est. value
Columbus, OH

Scioto River Boat Launches
Results
Less than $635,394 est. value
OH

Griggs Boat Launch Improvements
Results
Less than $1,330,000 est. value
Columbus, OH

Point Place Levee Closure Devices Replacement and Repair
Results
Toledo, OH 43604

2020-2023 Seasonal Dock Installation and Removal
Term Contract
Results
Sandusky, OH 44870

Mentor Lagoons Park Marina Bulkhead Replacement
Results
$500,000 est. value
Kirtland Hills, Mentor, OH 44060

Last Updated 05/25/2021 04:44 PM
Project Title

Mahoning River Canoe/Kayak Livery

Physical Address View project details and contacts
City, State (County) Leavittsburg, OH 44430   (Trumbull County)
Category(s) Heavy and Highway
Sub-Category(s) Dock/Pier/Marine
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $140,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of a canoe launch on the north bank of the Mahoning River in the Village of Lowellville West Water St extension. The project includes the following construction work but is not limited to: Site preparation and layout of the specified construction elements, construction of a concrete canoe ramp/launch, construction of concrete steps connected to the launch, foundation preparation and construction, installation of steel reinforcement, and underpinning to fasten the step foundations to the existing river bank. The proposed project shall conform to the shape of the existing river bank and not protrude vertically from the existing river bank so as to negatively limit the existing river floodplain. Contractor is responsible for all permitting requirements if his construction activities are to change the existing bank conditions or encroach into the river.

Details

Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Marine Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents