Similar Projects
Plumbing Fixtures Installed
Term Contract
Design
Vicksburg, MS 39183

Mississippi Water System Improvements Contract A - Meter Materials Contact
Term Contract
Sub-Bidding
$150,000 CJ est. value
Booneville, MS 38829

Bottle Fill Stations
Alteration
Post-Bid
Gulfport, MS

Plumbing Services
Term Contract
Post-Bid
Ellisville, MS 39437

4610-- Reverse Osmosis Water System
Term Contract
Results
Biloxi, MS 39531

District One Bottle Filler Replacement Project
Alteration
Results
$599,000 est. value
Hernando, Olive Branch, Southaven, MS 38672

On-Call Plumbing, Sewer and Drain Services
Infrastructure, Alteration
Post-Bid
Gulfport, MS

District Three Bottle Filler Replacement Project
Alteration
Results
Hattiesburg, Hernando, Lake Cormorant, Walls, MS 39402

Sunflower County Consolidated School District ESSER 2 and 3, Phase 1
Alteration
Post-Bid
Drew, Indianola, Ruleville, MS 38737

2022 Wastewater Improvement Project
Infrastructure
Results
$206,932 CJ est. value
Duncan, MS 38740

On Call Plumbing Services
Alteration
Post-Bid

Hunters Ridge Sewer Slope Stabilization and Sewer Repair
Infrastructure
Results
$286,720 CJ est. value
Clinton, MS 39056

District Four Bottle Filler Replacement Project
Alteration
Post-Bid
$300,000 est. value
Hernando, MS

Loyd Star Attendance Center New Football and Soccer Complex
New Construction, Infrastructure
Results
$3,541,739 CJ est. value
Wesson, MS 39191

Plumbing and Mechanical Services
Alteration
Post-Bid
University, MS

Last Updated 03/08/2023 04:07 AM
Project Title

TC-6 Erosion Control and Repair Project

Physical Address View project details and contacts
City, State (County) Senatobia, MS 38668   (Tate County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Results, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $2,082,748 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The work consists of: The work consists of, but is not limited to, disturbing 22 acres, clearing and grubbing, excavating and widening drainage channels, placing and/or replacing storm drain pipe, levee construction and reconstruction, stabilizing banks around lakes, installing and maintaining erosion control items, and grassing and sodding. Contract time is 150 Working Days. Contractor shall commence work on or before a date to be stipulated in the Notice to Proceed. Questions regarding portal registration and online orders please contact Plan House Printing at (662) 407-0193. The contract will be awarded to the lowest and/or best bid from a responsive responsible and qualified Bidder. Should no award be made within forty-five (45) calendar days after opening of proposals, all proposals may be rejected and all proposal guaranties returned, unless the lowest responsive responsible qualified bidder at the request of the Tate County Board of Supervisors agrees in writing to a longer delay. Bid bond, signed or countersigned by a Licensed Mississippi Agent, or Mississippi Non-Resident Agent licensed to do business in the State of Mississippi, with Power of Attorney attached, or Cashier's check or Certified check for five percent (5%) of the total bid, payable to the Tate County Board of Supervisors, must accompany each proposal. Bidders are hereby notified that any proposal that is submitted as a stripped bid will be considered an irregular bid and such proposal will not be considered in making the award. The Tate County Board of Supervisors reserves the right to waive any irregularities and to reject any and all bids if considered not in the best interest of the Tate County Board of Supervisors. Bidders are hereby notified that any proposal accompanied by letters qualifying in any manner the condition under which the proposal is tendered will be considered an irregular bid, and such proposals may not be considered in making the award. The Tate County Board of Supervisors reserves the right to waive any irregularities and to reject any and all bids if considered not in the best interest of the Tate County Board of Supervisors.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents