Similar Projects
Conveyance System Infrastructure Improvements: Sewer In-System Storage and Valve Remote Improvements
Infrastructure
Bidding
$5,000,000 est. value
Detroit, MI

OTT Story Superfund Site Operable Unit #2 Groundwater Remedy - Phase I
New Construction
Post-Bid
$5,000,000 to $10,000,000 est. value
Muskegon, MI

2021 Six-Inch (6") Trailer Mounted Centrifugal Trash Pump Purchase
Post-Bid
Mount Pleasant, MI

Water Well and Yard Hydrant Installation
Results
Rochester, MI 48306

Wastewater Treatment Plant West Screw Pump Replacement
Results
Big Rapids, MI

2016 Bond Projects - Bailey Lake Elementary Well System Improvements
Post-Bid
Clarkston, MI 48348

Supply and Delivery of Parts for Gorman Rupp Pumps
Results
Camden, MI

William Stone #1 Orphan Well Project
Renovation
Post-Bid
Lansing, MI

Plugging, Drilling, Re-drilling and Site Restoration of Oil and Gas Wells
Results
Lansing, MI

Wet Well Vactoring
Infrastructure
Post-Bid
Brighton, MI

Sewage Pump Outs
Term Contract
Results
Rochester, Rochester Hills, MI 48307

Leachate Pump and Sump Drainer
Infrastructure
Post-Bid
Livonia, MI

Vault Pumping and Disposal Services for Hartwick Pines State Park
Results
Grayling, MI 49738

WWTP Backwash Pump
Infrastructure
Post-Bid
Novi, MI 48377

Tri County Test/Production Well
Results
Pierson, MI 49339

Last Updated 07/04/2022 01:19 AM
Project Title

Walled Lake-Novi Wastewater Treatment Plant Raw Sewage Pump

Physical Address View project details and contacts
City, State (County) Novi, MI 48377   (Oakland County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $700,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Raw sewage pump as part of their Walled Lake-Novi Wastewater Treatment Plant (WWTP) headworks system. Provide one complete pumping unit, including motor and any necessary appurtenances for a fully functioning pump. Provide any necessary spool and reducer pipe fittings to properly connect the pump to the existing inlet and outlet piping. The pump inlet size shall be a minimum of 1 size smaller than the inlet piping size. The existing inlet piping size is 8 inches.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents