Similar Projects
Olympia Hills
New Construction, Infrastructure
Design
$2,000,000,000 CJ est. value
Herriman, UT 84096

Chrome Works
New Construction, Infrastructure
Design
$88,000,000 CJ est. value
Salt Lake City, UT 84101

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

SoHi Apartments
New Construction, Infrastructure - 169,093 SF
Post-Bid
$40,000,000 CJ est. value
Salt Lake City, UT 84101

SoHi Apartments
New Construction, Infrastructure - 169,093 SF
Post-Bid
$40,000,000 CJ est. value
Salt Lake City, UT 84101

Bengal Blvd and 2300 East Round-About Intersection Modification
Infrastructure
Results
$1,500,000 to $3,000,000 est. value
UT

Rushton Waterlines Project
Infrastructure
Results
$2,059,000 est. value
West Valley City, UT

Thackeray Towns
New Construction, Infrastructure
Pending Verification
$15,000,000 CJ est. value
Sandy, UT 84070

Bueno Avenue Apartments
New Construction, Infrastructure
Pending Verification
$24,000,000 CJ est. value
Salt Lake City, UT 84102

Pura Vita Senior Housing
New Construction, Infrastructure
Design
$6,000,000 CJ est. value
West Jordan, UT 84088

Huntsman Mental Health Institute Utah Translational Research Facility
New Construction, Infrastructure - 185,000 SF
Post-Bid
$105,000,000 CJ est. value
Salt Lake City, UT 84108

Tax Commission Building Concrete/Irrigation Repairs
Infrastructure
Results
$195,000 est. value
Salt Lake City, UT 84103

Dowland Townhomes
New Construction, Infrastructure
Pending Verification
$3,000,000 CJ est. value
South Salt Lake, UT 84115

At 2100 Apartments II
New Construction, Infrastructure
Design
$60,000,000 CJ est. value
Salt Lake City, UT 84115

Last Updated 03/09/2023 09:01 PM
Project Title

Mcclelland Trail and Neighborhood Street

Physical Address View project details and contacts
City, State (County) Salt Lake City, UT 84111   (Salt Lake County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $5,614,410 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

1100 EAST RECONSTRUCTION, JOB NO. RDW22003 AND MCCLELLAND TRAIL AND NEIGHBORHOOD STREET, JOB NO. RDW20056. Emailed bids or bids delivered to any other location will not be accepted. When submitting a bid electronically, bidders must allow sufficient time before the deadline to complete the forms and upload documents. The bid event will end at the closing time posted on SciQuest. If a bidder is in the middle of uploading a bid when the closing time arrives, SciQuest will stop the process and the bid or bid modification will not be accepted The Construction Contract will be awarded in compliance with Salt Lake City Building Improvement and Public Works Bidding Program which takes into account certain factors in the Bidders work environment (See Salt Lake City Code Section 3.24.115) (See Document 00 22 16, Article 1.2, paragraph A for a link to the City Code). Attendance is highly encouraged. All contractors intending to submit a bid are invited to attend to obtain relevant information concerning the project. Bidders are advised that information affecting drawings, specifications, conditions, Scope of Work, etc. may be discussed. OWNER assumes no obligation to disclose information discussed at the pre-bid conference to Bidders who do not attend. Absent Bidders assume all risk of failure to attend. The work to be performed consists of furnishing and installing the equipment, facilities, services, and appurtenances indicated in the Contract Documents. The Work generally includes, but is not limited to street improvements (i.e. replacement of concrete flatwork, ADA ramps, and curb & gutter; rotomill, reclaimed aggregate, asphalt pavement and concrete pavement), and storm drainage upgrades. The City reserves the right to reject any or all bids or to waive any informality or technicality in any Bid if deemed to be in the best interest of the City. In compliance with Americans with Disabilities Act (ADA), the following information is provided: FAX number 801.535-6093, TDD Number 801.535-6219, contact person: Dan Hanover, 385-315-0795, City Engineers Office. If assistance is required, please contact the above office 72 hours before the bid opening Question Submission Close Date 2/9/2023 5:00 PM MST Notice to Proceed for Construction: Anticipated April 10, 2023. Time of Completion: Substantial Completion is November 17, 2023.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents