Similar Projects
Mountain Shadows Sidewalk Project 2022
Infrastructure
Bidding
Smithsburg, MD

Avilton Community Center Sidewalk Construction
Infrastructure
Bidding
Lonaconing, MD 21539

Parking Lot Expansion Project
Post-Bid
Princess Anne, MD 21853

Pad & Parking Lot for A Prefabricated Structure,U.S. Department of Agriculture (USDA), Beltsville Agricultural Research Center (BARC)
Post-Bid
$250,000 to $500,000 est. value
Beltsville, MD

Curb Repair Citywide
Results
$500,000 to $1,000,000 est. value
Baltimore, MD 21200

Removal and Replacement of Concrete Curb and Sidewalk Countywide
Term Contract
Results
Rockville, MD 20850

Beverly Triton Nature Park
New Construction
Construction
$3,000,000 est. value
Edgewater, MD 21037

4612 Mercedes Drive Parking Lot
Infrastructure
Pending Verification
Belcamp, MD

Dominion Cove Point - Commuter Parking Lot And Warehouse, Phases 2 & 3
New Construction - 28,000 SF
Pending Verification
Lusby, MD 20657

Roadway and Parking Lot Expansion
Infrastructure
Bidding
Salisbury, MD 21804

Longfield Drainage Improvements
Post-Bid
$2,500,001 to $5,000,000 est. value
Forestville, MD 20747

Buddy Attick Park Parking Lot Reconstruction
Results
$100,000 to $500,000 est. value
Greenbelt, MD 20770

Parking Area Stabilization
Infrastructure
Bidding
Less than $50,000 est. value
Prince Frederick, MD 20678

University of Maryland College Park Site Improvements at Ellicott Hall
Post-Bid
College Park, MD 20740

Curb and Gutter Replacement
Results
Fruitland, MD 21826

Last Updated 02/25/2022 07:30 AM
Project Title

US 1 (Washington Blvd) at Four Locations Between Prince George's County Line and Doctor Patel Drive Sidewalks - Howard County

Physical Address View project details and contacts
City, State (County) State-Wide: MD
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,500,000 to $5,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project involves upgrades to pedestrian facilities and signalized crossings of US 1 at four locations in Howard County – at Brewers Court, at Guilford Road, at Rowanberry Drive, and at Doctor Patel Drive. The work will consist of the following: US 1 at Brewers Ct: a) Construction of ADA compliant sidewalk ramps and median refuge within the US 1 at Brewers Ct intersection; b) Installation of overhead and ground mounted Rectangular Rapid-Flashing Beacon (RRFB) signals and signage at the US 1 at Brewers Ct intersection; c) Milling of existing pavement and overlay along US 1 with signing, and pavement marking upgrades. US 1 at Guilford Rd: a) Construction of a shared-use path along southbound US 1 between existing sidewalk at the southwest corner of the z intersection and at the entrance to 8550 Washington Blvd, for a total length of approximately 1,300 feet; b) Construction of ADA compliant sidewalk ramps within the US 1 at Guilford Rd intersection and at driveway/entrance crossings along sidewalk length; c) Modifications to existing traffic signals, pedestrian push button upgrades, crosswalks at the US 1 at Guilford Rd intersection; d) Milling of existing pavement and overlay along US 1 with signing, and pavement marking upgrades; e) Offsite stormwater management (SWM) improvements. US 1 at Rowanberry Dr: a) Construction of sidewalk along northbound US 1 between South Hanover Road onto Old Washington Blvd to the driveway at 6387 Old Washington Rd, for a total length of approximately 1,700 feet ; b) Construction of ADA compliant sidewalk ramps within the US 1 at Rowanberry Rd intersection and at driveway/entrance crossings along sidewalk length; c) Modifications to existing traffic signals, pedestrian push button upgrades, crosswalks at the US 1 at Rowanberry Dr intersection; d) Milling of existing pavement and overlay along US 1 with signing, and pavement marking upgrades; e) Drainage pipe installation along northbound US 1 and Old Washington Rd; f) Offsite SWM improvements. US 1 at Doctor Patel Dr: a) Construction of sidewalk along southbound US 1 between developer-built sidewalk north of Montgomery Rd and Doctor Patel Dr, and along northbound US 1 between the entrance for 6241 Old Washington Rd and Doctor Patel Dr, for a total length of approximately 700 feet; b) Construction of ADA compliant sidewalk ramps and median refuge within the US 1 at Doctor Patel Dr intersection and at driveway/entrance crossings along sidewalk length; c) Installation of overhead and ground mounted RRFB signals and signage at the US 1 at Doctor Patel Dr intersection; d) Milling of existing pavement and overlay along US 1 with signing, and pavement marking upgrades.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents