Similar Projects
Burlington HES 5000 (18)
Bidding
$5,000,000 to $10,000,000 est. value
Burlington, VT

Bridport-Cornwall STP FPAV (45) and Bridport-Middlebury Hes Rmbl (5)
Bidding
$500,000 to $1,000,000 est. value
Bridport, Cornwall, Middlebury, VT

Colchester Avenue Sidepath Construction
Post-Bid
$250,000 to $500,000 est. value
Burlington, VT

CY 20 Street Reconstruction Program
Post-Bid
$1,300,000 to $1,500,000 est. value
Burlington, VT 05401

New Haven-Bristol PS19 (8)
Results
$1,000,000 to $2,500,000 est. value
Bristol, New Haven, VT 05443

Poker Hill Road Improvements – Segment C and D
Results
$380,320 est. value
Underhill, VT 05489

North Avenue Raised Intersection
Bidding
Less than $250,000 est. value
Burlington, VT 05401

Paving
Post-Bid
Jamaica, VT 05343

Vergennes STP PC20 (1) and Bristol STP PC20 (2)
Results
$2,500,000 to $5,000,000 est. value
Bristol, Vergennes, VT 05491

Georgia-St Albans Town STP FPAV (40)
Bidding
$2,500,000 to $5,000,000 est. value
Georgia, Saint Albans, VT

Department of Public Safety Gate Alterations and Paving
Post-Bid
$50,000 est. value
Saint Albans, VT

Bituminous Concrete Crack Sealing
Results
Rutland, VT 05702

Retainer Contracts for Asphalt Paving, Sealing & Striping Services Statewide
Term Contract
Bidding

Cold Patch 2021
Post-Bid
Rutland, VT

Moretown STP PS20(1)
Results
$1,000,000 to $2,500,000 est. value
Moretown, VT 05660

Last Updated 04/16/2020 11:10 AM
Project Title

2020 Spring Paving

Physical Address View project details and contacts
City, State (County) Hyde Park, VT 05655   (Lamoille County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $101,025
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1.All traffic control during construction 2.Construction signage in accordance with MUTCD 3.Surface temperature of existing pavement to be 45 degrees and air temp to be 40 degrees and rising at the time new asphalt is applied. 4.Saw cut begin and end locations as marked by the Town 5.Removal of existing pavement and compaction and leveling of base gravel material 6. Placement of a base course of Type III and a wearing course of Type IV bituminous concrete as described herein. 7. Access to the residences and businesses must be maintained at all times. Work Locations: Site 1 - Roadway - North Hyde Park Road at Thompson Hill Road Site 2 - Culvert Site - Mudgett Hill Road Site 3 - Culvert Site - North Hyde Park Road at Harvey parcel Site 4 - Bridge Site - Whitcomb Island Road and Barnes Road Site 5 - Culvert Site - Centerville Road at Mead Road.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents