Similar Projects
Chip and Fog Seal and Pavement Markings on Pleasantview Road
Infrastructure
Design
$232,000 CJ est. value
Pellston, MI 49769

Chip and Fog Seal and Pavement Markings on Pleasantview Road
Infrastructure
Design
$232,000 CJ est. value
Pellston, MI 49769

Install Outdoor Exercise Equipment Along Warrior Trail
Infrastructure
Bidding
$200,000 CJ est. value
Harbor Springs, MI 49740

Install Outdoor Exercise Equipment Along Warrior Trail
Infrastructure
Bidding
$200,000 CJ est. value
Harbor Springs, MI 49740

Paving & Site Lighting
Post-Bid

Removal of Thin Epoxy Overlay
Infrastructure
Post-Bid

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Calumet-Swedetown Trail Capping, And Route Grading
Results

Pre Qualified Maintenance - Cold Water Welcome Center-HMA-I-69
Infrastructure
Post-Bid

2021 Greenwood/Cemetery Road - Road and Utility Rebuild
Results
Petoskey, MI 49770

Pit Cleaning-Bascule Bridges, Multiple Services
Infrastructure
Post-Bid

2.00 MI of Overband Crack Fill, Single Course Chip Seal
Results
Mackinaw City, MI

Roadside Mowing and Litter Pickup/Disposal Services Oakland County
Term Contract
Post-Bid
West Bloomfield, MI 48323

Road Repair - Skip Paving, HMA
Infrastructure
Results

Concrete Installation and Replacement District-Wide - District Wide Sidewalk Replacement
Infrastructure
Post-Bid
$250,000 CJ est. value
Pellston, MI 49769

Last Updated 08/04/2022 06:32 PM
Project Title

Milton Road

Physical Address View project details and contacts
City, State (County) Alanson, MI 49706   (Emmet County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $730,584 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

For the upgrade of the following road in Maple River Township, Littlefield Township, and Village of Alanson: 1.) Milton Road, from Powers Road then north to U.S. 31 for 2.71 miles The Board reserves the right to accept or reject any and all bids, to waive irregularities in the bid procedure, and to award in the best interest of the Road Commission. No contractual relationship shall exist between the undersigned and the Board for the work described herein until such a time as the full contract documents have been formally executed by both the contractor and the Board.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents