Similar Projects
Roanoke - South Weston Road
Infrastructure
Design
$6,200,000 CJ est. value
Weston, WV 26452

Menards - Charles Pointe Crossing / Bridgeport
New Construction, Infrastructure - 200,000 SF
Design
$12,000,000 CJ est. value
Bridgeport, WV 26330

Stony River Br
Demolition, New Construction, Infrastructure
Bidding
$4,000,000 CJ est. value
Mount Storm, WV 26739

Pedestrian/bike Facilities - Berkeley Springs Street Park Improvement
Infrastructure
Bidding
$376,000 CJ est. value
Berkeley Springs, WV 25411

RFQ Construction Manager - Addition to West Virginia Health Right
Addition, Demolition, Infrastructure
Post-Bid
$10,000,000 CJ est. value
Charleston, WV 25311

New Fire Station for the Ridgeley VFD - Ridgeley Volunteer Fire Department
New Construction, Infrastructure
Post-Bid
$875,000 CJ est. value
Ridgeley, WV 26753

DFM Coal, LLC S-4004-01 OSR Land Reclamation Project
Term Contract, Infrastructure
Results
WV

Site Work for Clendenin Library
Infrastructure
Results
Clendenin, WV 25045

Meadow River Trail Russellville Bridge Replacement
Demolition, New Construction, Infrastructure
Construction
$981,245 CJ est. value
Fayetteville, WV 25840

Moundsville Power Plant
New Construction, Infrastructure - 450,000 SF
Pending Verification
$615,000,000 CJ est. value
Moundsville, WV 26041

Church Street Sewer Repair - City of Clarksburg
Infrastructure
Pending Verification
$900,000 CJ est. value
Clarksburg, WV 26301

WV 7 OP Interchange (Auth AC Project) (Split Funded)
Infrastructure
Design
$20,000,000 CJ est. value
Osage, WV 26543

Upgrade to 5 Lane Road - WV 622 Cross Lanes
Infrastructure
Bidding
$16,000,000 CJ est. value
Charleston, WV 25312

Bable Street Homes
New Construction
Post-Bid
$300,000 est. value
Wheeling, WV 26003

Charles Hagerman Way Parking
Infrastructure
Results
South Charleston, WV

Last Updated 04/05/2023 12:08 PM
Project Title

Retaining Wall Replacement - Engineered SRW Gravity Block

Physical Address View project details and contacts
City, State (County) Mount Hope, WV 25880   (Fayette County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Single-Family Homes, Site Development
Contracting Method Competitive Bids
Project Status All Bids Received, Selection Expected, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $90,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Mount Hope Housing Authority, Mount Hope, West Virginia will receive sealed bids at its Administrative Offices at 9B Midtown Terrace for the FY2020 / 2021 Capital Fund Program - Physical Improvements - Retaining Wall Replacement - Engineered Srw Gravity Block, until 10:00 AM EST on the 3rd day of April, 2023, at which time and place all bids will be publicly opened and read aloud. Bidder may also examine bid documents at the following locations: Mount Hope Housing Authority Adkins Design, INC. 9B Midtown Terrace 1522 Clearview Heights. Mount Hope, West Virginia 25880 Charleston, WV 25312 Attn: Ms. Stormy Parsons Attn: Larry Adkins, AIA Mount Hope Housing Authority reserves the right to reject any or all bids or to waive any informalities in the bidding. No bid shall be withdrawn for a period of sixty (60) days subsequent to the opening of bids without the consent of the Mount Hope Housing Authority. Completion- 120 consecutive calendar days Retaining Wall 1 - Replace existing stone retaining wall,concrete steps, sidewalks, fencing, railing, backfill, etc. as shown for Base Bid and all associated work. Parking Lot 1 - Mill existing parking lot, make repairs and overlay entire parking lot, raise drop inlet, paint and stripe, etc as shown for Base Bid and all associated work. Retaining Wall 2 - Replace existing stone retaining wall, concrete steps, sidewalks, fencing, railing, backfill, etc. as shown for Base Bid and all associated work. Areas 5 & 6 - Replace existing street access steps and all associated work Add Alternate Cost 1 -Retaining Wall 1 - Extend retaining wall, parking lot, etc., reconfigure steps and all associated work with reconfiguration. Add Alternate Cost 2 -Retaining Wall 2 - Extend retaining wall, parking lot, etc., reconfigure steps and all associated work with reconfiguration. The project consists of but is not limited to the replacement of existing stone retaining walls, sidewalks, steps, handrail, etc, and associated work items for a complete project and fully usable at Stadium Terrace apartments at Mount Hope Housing MBE (20%), WBE (20%) The project consists of but is not limited to the replacement of existing stone retaining walls, sidewalks, steps, handrail, etc, and associated work items for a complete project and fully usable at Stadium Terrace apartments at Mount Hope Housing, as shown on Contract Documents prepared by Adkins Design, Inc. Question Deadline Mar 23, 2023 at 4:00 PM All questions shall be directed to the Architect via email.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents