Similar Projects
Last Updated | 02/25/2021 03:09 PM |
Project Title | Water Meter Replacement |
Physical Address | View project details and contacts |
City, State (County) | Bowling Green, VA (Caroline County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Water Lines |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Project consists of the replacement of the Town of Bowling Green’s existing water meters identified in the plans and specifications and the installation and implementation of an Advanced Metering Infrastructure system (AMI). The work shall all materials, labor and equipment necessary to provide the following: 1. Furnish and install all materials, water meter equipment, software, labor, and construction as necessary to furnish, install, and place in operation a complete AMI Metering System. 2. Furnish and install new complete meter assemblies including, excavation, isolation of existing water service, cutting pipe, new meter barrel, lid, meter setting, and all necessary materials required to connect to the existing water service. 3. Removal and disposal of the old existing water meter assemblies and barrel, including excavation and pipe cutting and restoration. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |