Similar Projects
Easy Street Force Main Replacement
Bidding
$593,853 est. value
Port Charlotte, FL 33952

Quesada Force Main Replacement
Bidding
$697,242 est. value
Port Charlotte, FL 33952

Coliseum Force Main Replacement
Results
Less than $496,000 est. value
Port Charlotte, FL 33981

Ramblewood Street Looping and Watermain Extension
Results
Less than $89,000 est. value
Port Charlotte, FL 33953

Grease Trap Total Clean Out
Term Contract
Results
Less than $35,000 est. value
Punta Gorda, FL 33980

El Jobean East Vacuum Sewer System
Results
Less than $6,010,000 est. value
Port Charlotte, FL 33948

Cape Haze Drive Reclaimed Water and Force Main
Results
Less than $1,998,000 est. value
Port Charlotte, FL 33948

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Deep Creek Force Main
Results
Less than $3,771,697 est. value
Port Charlotte, FL 33948

Manhole Rehabilitation - Annual Contract
Term Contract
Results
Port Charlotte, FL 33948

Ackerman Vacuum Sewer Collection Zones 1 and 2 and Vacuum Station
Results
Less than $15,233,200 est. value
Port Charlotte, FL 33948

SVC-VALVEINSTALL/1626 - Installation of Valves
Results
$26,950 est. value
Punta Gorda, FL 33950

Concrete Catch Basins - Annual
Term Contract
Results
Port Charlotte, FL 33948

Installation of Water Main Line
Results
Port Charlotte, FL

Trenchless/No-Dig Sewer Repair
Results
$40,000 est. value
Port Charlotte, FL

Last Updated 09/17/2020 10:16 PM
Project Title

Construction of Lift Station 2 with a Forcemain and Watermain

Physical Address View project details and contacts
City, State (County) Port Charlotte, FL   (Charlotte County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations, Sanitary Sewers, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,400,500
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Furnish all material, labor, equipment and all other associated appurtenances required to successfully complete the construction of the replacement of Lift Station #2, the associated six (6”) inch wastewater forcemain and the eight (8”) inch watermain along Conway Boulevard

Details

Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents