Similar Projects
C-NS High School Community Pool Facility Construction
New Construction
Conception
Cicero, NY 13039

Highview at the Fallkill Creek
New Construction
Design
Poughkeepsie, NY 12601

Highline Park Residential
New Construction
Design
Victor, NY 14564

Echo Park Pool Building Rehabilitation - General Construction
Renovation
Bidding
$500,000 CJ est. value
West Hempstead, NY 11552

Capital Improvements Project - Phase 1A- Pool
Renovation
Bidding
$425,000 CJ est. value
Corning, NY 14830

Pool Resurfacing - SHS
Infrastructure
Post-Bid
Schenectady, NY

Pool Filter Upgrade
Alteration
Post-Bid
New York, NY 10128

Replacement Vinyl Pool Linear at Congers Memorial Park
Results
Clarkstown, NY

Municipal Pool Repairs
Results
Chateaugay, NY 12920

The West Condominiums
New Construction - 4,100 SF
Construction
$19,000,000 est. value
Saratoga Springs, NY 12309

Mamaroneck Avenue Apartments
New Construction - 2,101 SF
Construction
$100,000,000 to $125,000,000 est. value
White Plains, NY 10605

One-Four-Six Marketplace
New Construction, Infrastructure - 151,000 SF
Pending Verification
$140,000,000 CJ est. value
Halfmoon, NY 12118

Summit At Halfmoon
New Construction, Infrastructure
Pending Verification
$26,000,000 CJ est. value
Halfmoon, NY 12065

Upgrade Dietz Stadium
Renovation
Design
$18,700,000 est. value
Kingston, NY 12401

Swimming Pool Repairs
Infrastructure
Bidding
$200,000 CJ est. value
Buffalo, NY 14202

Last Updated 10/17/2022 08:01 PM
Project Title

Swim Center Rehabilitation - General Trades Contract 101

Physical Address View project details and contacts
City, State (County) Hamburg, NY 14075   (Erie County)
Category(s) Entertainment/Recreation
Sub-Category(s) Swimming Pool(s)
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected December 2022 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $1,206,400 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Replace pool gutter, upgrade electrical, filtration and chemical treatment systems. The following work is assigned to each Prime Contract: 1. All sections of Division 00 – Procurement and Contracting Requirements. 2. All sections of Division 01 – General Requirements. B. The following notes are assigned to each Prime Contract: 1. Bidders are forewarned to review all information in the Contract documents. 2. All Bidders shall visit the site to verify and review existing conditions before estimating the cost of the project. 3. All Contractors are responsible for the layout and survey of their own work. 4. All Contractors are responsible for dewatering for the work of their contract. 5. All Contractors are responsible for offsite disposal of unsuitable spoil and/or excess soils resulting from their own work. 6. All Contractors are required to construct the project per the Schedule. All Contractors shall cooperate fully with the intentions of the schedule. 7. Each Contractor shall provide temporary shoring, bracing, supports, or protection systems needed to complete the Work of their Contract. All Contractors are responsible, individually, and collectively, for maintaining safe-working conditions at all times in compliance with OSHA safety regulations. Contractors will be responsible, where required by the Owner or Architect, to provide Professional Structural Engineering design for temporary shoring, bracing, supports or protection systems. 8. All Contractors are responsible for the safety of their own workers, subcontractors, and other personnel on site. Each and every Contractor is responsible for maintaining a safe work site, and for maintaining safe work procedures. Protect all Village facilities and personnel. 9. Each Contractor is required to implement and maintain a project specific safety program. The program shall include company safety philosophy, history, action plan, manuals, hazardous communications sheets, OSHA filings, meeting minutes and a reporting system for any accidents or injuries.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Concrete Finishing.
Division 09 - Finishes, Special Coatings, Cementitious Coatings.
Division 13 - Special Construction, Swimming Pools, Recirculating Gutter Systems, Swimming Pool Accessories, Swimming Pool Cleaning Equipment.
Division 22 - Plumbing, Pool and Fountain Plumbing Systems, Swimming Pool Plumbing Systems.
Division 26 - Electrical, Special Purpose Lighting, Underwater Lighting.
Division 31 - Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents