Similar Projects
Traffic Signal at US30/Indiana Street - Village of Park Forest
Infrastructure
Conception
$300,000 CJ est. value
Park Forest, IL 60466

Meacham Road Overhead Utility Line Burial - Village of Schaumburg
Infrastructure
Conception
$1,000,000 CJ est. value
Schaumburg, IL 60173

RFQ Contractor - Terminal 5 Landside and Parking Improvements - Bid Package 8
Infrastructure
Design
$200,000 CJ est. value
Chicago, IL 60666

Capital Improvements - 2022 Bond - Neoga School District
Renovation
Design
$4,600,000 est. value
Neoga, IL

Resurface Pittsburg Road
Infrastructure
Bidding
$3,595,307 CJ est. value
Pittsburg, IL 62974

2022-2023 Millard Bluff Grading and Tree Removal
Infrastructure
Bidding
$160,000 CJ est. value
Highland Park, IL 60035

2022 Crack Routing and Sealing
Infrastructure
Sub-Bidding
$300,000 CJ est. value
Hanover Park, IL 60133

New Elementary School – Bid Release 3
New Construction - 86,260 SF
Post-Bid
Hampshire, IL

Bayles Lake HOA Hydropneumatic Storage Tank and Treatment Building
New Construction, Renovation, Alteration
Post-Bid
$400,000 est. value
Loda, IL

2021 Summer Facilities Improvements
Renovation
Results
Hickory Hills, IL 60457

CPS Stone Elementary NPL
Renovation
Results
Chicago, IL 60659

Petnet - Sitework
Alteration
Construction
Elk Grove Village, IL 60007

Washington Elementary School Facility Expansion
Addition - 7,000 SF
Construction
Park Ridge, IL 60068

University of Chicago Medicine Clinical Cancer Center
New Construction, Infrastructure - 500,000 SF
Pending Verification
$633,000,000 CJ est. value
Chicago, IL 60637

Windsor Road Resurfacing
Infrastructure
Pending Verification
$300,000 CJ est. value
Urbana, IL 61801

Last Updated 09/09/2022 10:34 AM
Project Title

Lincoln School Canopy Replacement

Physical Address View project details and contacts
City, State (County) Pittsburg, IL 62974   (Williamson County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Elementary School, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $198,971 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

As of September 9 2022 there is an awarded bidder. Project Description: Bid #1: Removal of existing canopy and the installation of new canopy at east side of Lincoln School. The Owner requires the project to be substantially complete by November 4, 2022. Bidders will be required to provide Bid security of a sum no less than 5 percent of the Bid Sum. The bid security shall be in the form of a certified check, cashier's check, bank money order or bid bond issued by surety licensed to conduct business in the State of Illinois. Hereinafter this bid security shall be referred to as the bid bond. Submit two copies of your Bid on the Bid Form provided. Bidders may supplement this form as appropriate. Your Bid will be required to be submitted under a condition of irrevocability for a period of 60 days after submission. Successful bidders shall be required to observe Illinois Public Act 77-1552 and the Illinois Department of Human Rights and Illinois Human Rights Commission Rules pertaining to Equal Employment Opportunity as provided for in paragraphs 2-101, et seq., Article II, Chapter 68, of the Illinois Revised Statutes; and comply with paragraph 271 of Chapter 48 of the Illinois Revised Statutes concerning the employment of citizens of the State of Illinois; and comply with Chapter 48, Sections 39s-1 through 39s12, of the Illinois Revised Statutes, as amended, known as the Prevailing Wage Determination, as issued by the Illinois Department of Labor. The Owner reserves the right to accept or reject any or all Bids or any part thereof, to waive any informality in bidding, and to accept bids deemed most favorable to the Owner.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents