Similar Projects
OTT Story Superfund Site Operable Unit #2 Groundwater Remedy - Phase I
New Construction
Post-Bid
$5,000,000 to $10,000,000 est. value
Muskegon, MI

Well Cleaning
Post-Bid
Lansing, MI 48901

Water Well and Yard Hydrant Installation
Results
Rochester, MI 48306

New Well House - Chittenden Nursery, Huron-Maniste National Forests
Results
$25,000 to $100,000 est. value
Wellston, MI 49689

Springfield Oaks New Well Project
Post-Bid
Davisburg, MI 48350

46--Selfridge ANGB Bldg 501 Sewage Pump Replacement
Results
Harrison Township, MI

Z--SLBE - Empire Water Renovation
Renovation
Post-Bid
$1,000,000 to $5,000,000 est. value
Empire, MI

Pump Replacement-LP
Results
Riverview, MI

2021 Six-Inch (6") Trailer Mounted Centrifugal Trash Pump Purchase
Post-Bid
Mount Pleasant, MI

Harvey Booster Station Pump 2 Inspection
Results
Muskegon, MI 49442

2016 Bond Projects - Bailey Lake Elementary Well System Improvements
Post-Bid
Clarkston, MI 48348

DNR Indian Lake State Park-Drill New Potable Water Well
Results
Manistique, MI 49854

William Stone #1 Orphan Well Project
Renovation
Post-Bid
Lansing, MI

Oden State Fish Hatchery Production Well 2 Reclamation
Results
Alanson, MI 49706

Wet Well Vactoring
Infrastructure
Post-Bid
Brighton, MI

Last Updated 12/17/2021 04:40 AM
Project Title

Pump Replacement/ Rebuild at FCGC

Physical Address View project details and contacts
City, State (County) Canton, MI 48188   (Wayne County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes removal and replacement of eight (8) pumps, four (4) located at Fellows Creek Golf Course and four (4) located at Summit on The Park 1. Option #1 removal and full replacement of the eight (8) total pumps 2. Option #2 removal and rebuild of the eight (8) total pumps

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents