Similar Projects
Repair Slumps on Hurricane Ridge and Obstruction Point Road
Alteration
Design
Port Angeles, WA

Design-Build Barrier Weir and Fish Ladder Modifications / Tsoo Yess River Barrier and Fish Passage Project
Infrastructure
Design
$1,000,000 to $5,000,000 est. value
Clallam Bay, WA 98326

I-90, SR 161, SR 202 and SR 203 - Fish Passage
Infrastructure
Bidding
$165,000,000 to $180,000,000 est. value
WA

US 2, East of Leavenworth Slope Stabilization (Small Works Roster)
Infrastructure
Bidding
$150,000 to $200,000 est. value
Leavenworth, WA 98826

Engineering Services for McSorley Creek Shoreline & Estuary Restoration Project
Renovation, Alteration
Post-Bid
$950,000 est. value
Des Moines, WA 98198

Geosynthetic and Erosion Control
Infrastructure
Post-Bid
WA

North South Monument Site Development
New Construction, Infrastructure, Alteration
Results
Bremerton, WA

Stratford Lane Step to Gravity Conversion
Infrastructure, Alteration
Results
$220,878 est. value
Olympia, WA

SR 20, Olson Creek and Unnamed Tributary to Skagit River - Fish Passage
Infrastructure
Bidding
$20,000,000 est. value
Concrete, WA 98237

Lower Satsop Right Bank Conservation
Infrastructure
Post-Bid
Montesano, WA

2021 Horse Creek Streambed Repairs Project
Infrastructure
Results
$90,000 to $100,000 est. value
Bothell, WA 98011

Hoypus Point Restoration
Infrastructure
Bidding
$200,000 to $240,000 est. value
Oak Harbor, WA

Fakkema Access Road
Infrastructure
Post-Bid
$650,000 to $850,000 est. value
Oak Harbor, WA 98277

Deception Creek Line Extension
Infrastructure
Results
$2,235,825 est. value
WA

SOOS Creek Hatchery Water Supply Treatment Supplemental Information
Infrastructure
Bidding
$2,500,000 est. value
Auburn, WA 98092

Last Updated 04/27/2022 03:13 AM
Project Title

Chumstick Creek Motteler Drive Culvert Replacement

Physical Address View project details and contacts
City, State (County) Leavenworth, WA 98826   (Chelan County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $320,000 to $354,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Chumstick Creek-Motteler Drive Culvert Replacement, Chelan County. This contract provides for the removal of one, 11-foot-span by 7-foot-rise, CMP arch culvert and all associated fill and the installation of one, 24-foot-span by 12-foot-rise, inverted three-sided concrete box culvert. The work includes, but is not limited to: procurement of all associated materials; temporary traffic control and management; establishment and improvements of access routes and staging areas; in-water site isolation, control of in-water turbidity; bank excavation and restoration; stream channel excavation and restoration; road improvements and paving, and other work.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Culverts, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents