Similar Projects
HUD - AC Replacement in LAN Room on 6th Floor
Post-Bid
Miami, FL 33131

Testing & Certifications of Fume Hoods
Post-Bid
Miami, FL 33125

Replace Chillers and Air Handlers, Multi-Facilities
Results
$500,000 to $1,000,000 est. value
Homestead, FL 33039

ACC-West Duct Heater Replacement (SBE Set Aside)
Results
$100,000 est. value
Miami, FL 33136

Weatherization Assistance Program - HVAC and Mechanical
Post-Bid
Less than $14,796 est. value
Miami, FL 33169

J041--Chiller 1 and 3 VSD Replacement
Results
Miami, FL 33125

HVAC Chillers/Equipment and Water Treatment Services
Post-Bid
FL

J045--Services: CLC Re-Heat Replacement, Miami VA
Results
Miami, FL 33125

HVAC and Mechanical Products
Term Contract
Post-Bid

Chiller Plant Services
Term Contract
Results
Miami, FL 33199

JL King Ductwork Cleaning Project
Post-Bid
Miami, FL 33132

HVAC and Controls: Replace, Supply and/or Install
Results
Miami, FL

Gemini ES CEP Upgrades
Post-Bid
Melbourne Beach, FL 32951

A/C Replacements at La Esperanza (Townhouses)
Results
Hialeah, FL

Homestead, ARB, FL HVAC IDIQ Sources Sought
Post-Bid
Homestead, FL

Reported 09/22/2021 12:00 AM
Project Title

Heating, Ventilation and Air Conditioning (HVAC) Multiple Award Construction Contract (MACC)

Physical Address View project details and contacts
City, State (County) Homestead, FL 33039   (Miami-Dade County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value $2,000 to $4,500,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Original Set Aside: 8(a) Set-Aside (FAR 19.8). Projects shall consist of tasks in a variety of trades to include demolition, site work, electrical, mechanical, and other specialty and general contracting work required for HVAC systems. They shall also include HVAC system evaluation, investigation, assessment, data collection and review, functional analysis, testing, balancing, energy analysis, reporting/documentation, maintenance, cost estimating and repair of issues identified by the contractor (to be verified by the Government prior to repairs). Seed Project Bldg 191: The contractor shall replace the faulting existing air-cooled chiller and replace chilled water valves, relief valves, pressure gauge, and thermometers on the chilledwater piping between the chiller and the building's exterior wall. All work shall be accomplished in accordance with the attached Statement of Work (SOW).

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents