Similar Projects
33-Unit Multifamily Residential Project
New Construction - 522,720 SF
Conception
Midvale, UT 84047

Multi Family Development
Conception
Ogden, UT

Eagle Point Townhomes Plat C
New Construction
Design
Eagle Mountain, UT

Masonic Temple Redevelopment
New Construction
Design
Salt Lake City, UT 84102

Senior Housing 4-Plex
New Construction - 3,180 SF
Bidding
$500,000 to $1,000,000 CJ est. value
Orem, UT 84097

Tag - Townhouses at Paxton
New Construction - 11,898 SF
Sub-Bidding
$1,000,000 to $5,000,000 CJ est. value
Salt Lake City, UT 84138

Millcreek Residential Roof Replacement
Post-Bid
Millcreek, UT

General Contractors for The Housing Rehabilitation Construction Services
Post-Bid
Ogden, UT

Dfcm Construction-Pre Qualified General-Dwr Bullfrog Housing Remodel-20275520
Renovation
Results
Less than $500,000 est. value
Taylorsville, UT

Annie's Acres Subdivision
New Construction
Construction
Spanish Fork, UT 84660

Woodmore Pointe Townhomes
New Construction
Construction
Logan, UT 84321

Gravel Pit and Development
Pending Verification
Willard, UT

The View On 20th
New Construction
Pending Verification
Ogden, UT

Multi-Family Homes
New Construction
Conception
Salt Lake City, UT 84103

The Epic Apartments at Overlake
New Construction
Design
Tooele, UT

Last Updated 11/11/2020 11:57 AM
Project Title

Y--Blm-Ut Green River District Residence Replacement

Physical Address View project details and contacts
City, State (County) Vernal, UT 84078   (Uintah County)
Category(s) Residential
Sub-Category(s) Multi-Family Homes
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $250,000 to $500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

BLM-UT GREEN RIVER DISTRICT RESIDENCE REPLACEMENT The Bureau of Land Management (BLM) intends to award a single, firm-fixed price contract to include the necessary qualified personnel, materials, equipment, and facilities to construct and complete the residence replacement at the Green River District, located within the Vernal Field Office (VFO). The Contractor shall prepare a work summary regarding each step of the residence construction associated with this project. Performance time is 150 days from the issuance of the Notice to Proceed.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents