Similar Projects
Edgewood Drive Office Development
New Construction, Infrastructure
Conception
$3,500,000 CJ est. value
Provo, UT 84604

Summit Ridge Commercial
New Construction
Design
Santaquin, UT 84655

Colarusso Industrial Park
New Construction
Design
Provo, UT 84601

Creative Signs Office
New Construction - 25,000 SF
Post-Bid
$1,000,000 to $5,000,000 CJ est. value
Spanish Fork, UT 84660

Awardco Tenant Improvements
Renovation - 68,908 SF
Post-Bid
Lindon, UT 84042

Morgan Stanley Interior Improvement
Renovation - 3,242 SF
Results
Provo, UT 84604

DFCM Construction-Standard Low Bid-DWR Fountain Green Fish Hatchery Power Plant Demolition
New Construction, Demolition
Results
$184,000 est. value
Alpine, UT

Deseret Industries And Bishop Storehouse
New Construction - 51,041 SF
Construction
$5,000,000 to $10,000,000 CJ est. value
Saratoga Springs, UT 84045

High Quality Carports
New Construction - 29,500 SF
Construction
Payson, UT 84651

2100 North Development
New Construction
Pending Verification
Lehi, UT 84043

Hardman Corner
New Construction
Pending Verification
Lehi, UT 84043

Sunrise Way Office Building
New Construction - 20,000 SF
Design
Less than $4,500,000 est. value
Lehi, UT 84043

RFP Construction Manager - Construction Manager / General Contractor for CWP Vineyard Wellfield Groundwater Polishing Project
New Construction, Renovation, Infrastructure
Post-Bid
$500,000 CJ est. value
Vineyard, UT 84059

500 East Auto Mall Drive Business Center
New Construction
Construction
American Fork, UT 84003

DPW3 Enterprises
New Construction
Pending Verification
Lehi, UT 84043

Last Updated 02/15/2023 02:01 PM
Project Title

Traverse Heights TIS - 6th Floor (DP3W) and 2nd Floor (Solidarity)

Physical Address View project details and contacts
City, State (County) Lehi, UT 84043   (Utah County)
Category(s) Commercial
Sub-Category(s) Office
Contracting Method General Contractor to Subcontract, Bids by Invitation
Project Status Construction complete as of December 2022 , Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $1,600,000 [brand] Estimate
Plans Available from General Contractor
Owner View project details and contacts
Architect View project details and contacts
Description

As of February 2023, the construction has been completed. *This project has been updated for historical data and reference purposes. The information has been provided as it was received and confirmed.

Details

Office, 2 Stories Above Grade, 15,757 SF Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Carpeting, Painting and Coating, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 12 - Furnishings, Window Treatments, Casework, Rugs and Mats, Office Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents