Similar Projects
Foothill Road: Dry Creek to Vilas Reconstruction - Jackson County
Infrastructure
Conception
$4,200,000 CJ est. value
Medford, OR 97504

Foothill Road: Dry Creek to Vilas Reconstruction - Jackson County
Infrastructure
Conception
$4,200,000 CJ est. value
Medford, OR 97504

Southern Oregon Seismic Slopes Stability
Infrastructure
Design
$8,700,000 CJ est. value
Medford, OR 97501

Southern Oregon Seismic Slopes Stability
Infrastructure
Design
$8,700,000 CJ est. value
Medford, OR 97501

Ashland Municipal Airport Taxiway Reconstruction and Rehabilitation
Infrastructure
Post-Bid
$1,875,390 CJ est. value
Ashland, OR 97520

Ashland Municipal Airport Taxiway Reconstruction and Rehabilitation
Infrastructure
Post-Bid
$1,875,390 CJ est. value
Ashland, OR 97520

2nd Street Improvements
Infrastructure
Results
$307,193 CJ est. value
Phoenix, OR 97535

2nd Street Improvements
Infrastructure
Results
$307,193 CJ est. value
Phoenix, OR 97535

Good Nite Place Mixed Use
New Construction, Infrastructure - 4,800 SF
Construction
$10,000,000 CJ est. value
Talent, OR 97540

Good Nite Place Mixed Use
New Construction, Infrastructure - 4,800 SF
Construction
$10,000,000 CJ est. value
Talent, OR 97540

Tower Business Park Town Homes
New Construction, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Medford, OR 97504

Pioneer Marketplace
New Construction, Infrastructure
Pending Verification
$3,000,000 CJ est. value
Medford, OR 97501

South Stage Road Improvements - STA 1824 - City of Medford
Infrastructure
Conception
$2,000,000 CJ est. value
Medford, OR 97501

Cherry Street Meats Distribution Center
New Construction, Infrastructure - 13,108 SF
Design
$7,000,000 CJ est. value
Medford, OR 97501

Interstate 5 MP 28-27 Paving
Infrastructure
Post-Bid
OR

Last Updated 07/25/2023 03:26 PM
Project Title

Foothill Rd: Delta Waters to Dry Creek

Physical Address View project details and contacts
City, State (County) Medford, OR 97504   (Jackson County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $6,658,671 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

These Specifications, provisions, and Special Provisions are issued for the information of Bidders submitting Bids for the Project or Work described herein at the time and place specifically indicated herein, subject to such revision as may be made in accordance with provisions stated below, and will be incorporated in and made a part of any Contract for said Project or Work that may be awarded on the basis of a Bid received at said specifically indicated time and place Region : 3 PE EA : PE003063 CON EA : CON04565 Foothill Rd: Delta Waters to Dry Creek Section Foothill Road Justin Shoemaker, Pm Estimated Value : $ 5,000,000 - $ 10,000,000 Class of Work: Either: A) Asphalt Concrete Paving and Oiling, or B) Earthwork and Drainage. The Oregon Department of Transportation is an Equal Employment Opportunity and Affirmative Action Employer. The policy of the Oregon Department of Transportation is to provide equal opportunity for participation in its contracting activities to all persons and firms in compliance with applicable Federal and State laws, rules and regulations. The Department of Transportation may reject any bid not in compliance with all prescribed public bidding procedures and requirements, and may reject for good cause any or all bids upon a finding of the Department of Transportation that it is in the public interest to do so. ORDOT - 002 - Foothill Rd: Delta Waters to Dry Creek *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. (1) The Contractor shall complete all Work to be done under the Contract required to complete Stage III and open Coker Butte Road to traffic before the elapse of 79 Calendar Days, or not later than August 23, 2024, whichever occurs first. Recording of Calendar Days will begin on the day the Contractor closes Coker Butte Road as set forth in 00220.40(f)(1). (2) The Contractor shall complete all Work to be done under the Contract required to complete Stage IV and open Foothill Road to traffic according to 00220.40(e)(1) before the elapse of 73 Calendar Days, or not later than November 7, 2024, whichever occurs first. Recording of Calendar Days will begin on the day the Contractor closes Foothill Road as set forth in 00220.40(f)(2). (3) The Contractor shall complete all Work to be done under the Contract, except for plant establishment, not later than June 30, 2025

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents