Similar Projects
Key Elementary School Modernization - AM0-SG403 - District of Columbia
Addition, New Construction, Renovation, Infrastructure
Conception
$20,500,000 CJ est. value
Washington, DC 20016

Key Elementary School Modernization - AM0-SG403 - District of Columbia
Addition, New Construction, Renovation, Infrastructure
Conception
$20,500,000 CJ est. value
Washington, DC 20016

The Portals / Phase IV
New Construction, Infrastructure
Design
$25,000,000 CJ est. value
Washington, DC 20024

Blow Pierce Elementary School Elevator Addition
Addition
Design
$900,000 est. value
Washington, DC 20002

Florida Ave North East and New York Ave North East Intersection
Infrastructure
Bidding
$35,000,000 CJ est. value
Washington, DC 20002

BlueMercury / Washington, D.C.
New Construction, Infrastructure
Bidding
$1,000,000 CJ est. value
Washington, DC 20009

Belmont Crossing Phase I - Vertical
New Construction, Infrastructure - 232,696 SF
Post-Bid
$25,000,000 CJ est. value
Washington, DC 20032

P-5001 Joint Air Defense Operations Phase 2
New Construction, Infrastructure
Post-Bid
$100,000,000 CJ est. value
Washington, DC 20036

Construction Management at-Risk Services for Smothers Elementary School
Results
$38,800,000 est. value
Washington, DC 20019

Design-Build Services for Raymond Elementary School
Results
Washington, DC 20010

Park Morton Demo, Site & Infrastructure
New Construction, Infrastructure
Construction
$12,000,000 to $13,000,000 est. value
Washington, DC

300 K Street Apartments
New Construction, Infrastructure
Construction
$114,000,000 CJ est. value
Washington, DC 20001

RFP Design - Architectural/Engineering Services for New Engine Company 26 Firehouse Facility
New Construction, Infrastructure
Pending Verification
$14,000,000 CJ est. value
Washington, DC 20018

The River School
New Construction, Renovation - 54,088 SF
Pending Verification
$5,000,000 to $10,000,000 CJ est. value
Washington, DC 20016

2215 5th Street Northeast Building Renovations - AM0-BRM16 - District of Columbia
Addition, Infrastructure, Renovation
Conception
$9,400,000 CJ est. value
Washington, DC 20002

Last Updated 12/19/2022 09:37 AM
Project Title

RFP D/B - Stoddert Elementary School Classroom Addition

Physical Address View project details and contacts
City, State (County) Washington, DC 20007   (District of Columbia County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Elementary School, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected June 2022 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $20,502,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of December 19, 2022, an architect has been selected for the project. A firm timeline for construction has not been established. *The closed solicitation has been included below for reference: Due Date for Questions: April 26, 2022, at 2:00 P.M The Design-Builder shall be subject to liquidated damages in an amount of Five Thousand Dollars ($5,000) plus Five Hundred Dollars ($500) per day after receiving written notice from the Contracting Officer of failure to submit such deliverables. Notice of intent to award (anticipated): June 13, 2022 Offerors are required to submit with their Proposals a bid bond in the amount of five percent (5%) of the total price proposal in the form. The Design-Builder will be required to post a payment and performance bond having a penal value equal to the Agreement amount at the time the Agreement is executed All communications with the Department's POC about the Project or this RFP shall be sent in writing to: Name: Peter Ghogomu Title: Contract Specialist Department of General Services Contracts and Procurement Division Mailing address: 1250 U Street, NW, 2nd Floor Washington, DC 20009 Email: peter.ghogomu@dc.gov Substantial Completion Date July 15, 2024 Final Completion Date January 15, 2025 The Department reserves the right, in its sole discretion To cancel this RFP, in whole or in part, at any time before the opening of Proposals and/or reject all Proposals.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents