Similar Projects
P-678 Dry Dock 8 Saltwater System for CVN-78
Alteration
Design
$100,000,000 to $250,000,000 est. value
Portsmouth, VA 23709

Drydock 8 Pumpwell Thimble Plate Repair
Post-Bid
$500,000 to $1,000,000 est. value
Portsmouth, VA 23709

P-095 Pier 3 Recap Naval Station
New Construction, Alteration - 193,050 SF
Post-Bid
$250,000,000 to $500,000,000 est. value
Norfolk, VA 23511

Z--Design-Bid-Build, RM10-4183 Replace Dry Dock 2 Caisson at Norfolk Naval Shipyard (NNSY), Portsmouth, VA
Results
$10,000,000 to $25,000,000 est. value
Portsmouth, VA

Mid Atlantic Construction IDIQ (MATOC)
Results
$50,000 to $2,000,000 est. value

Cumberland Marsh Natural Area Preserve Elevated Boardwalk and Canoe/Kayak Launch
Infrastructure
Post-Bid
VA

Pier Fenders & Hardware
Results
Portsmouth, VA 23703

NAVFAC Replace Mooring Cleats on LC Piers 20 - 34 (Part 2)
Alteration
Post-Bid
Virginia Beach, VA 23453

Lake Ridge Park Marina Dock
Results
Woodbridge, VA 22192

Widewater State Park, Aquia Creek Accessible Paddle Launch
Infrastructure
Post-Bid
Stafford, VA 22554

Occoquan Regional Park Boat Ramp Hardscape
Results
Lorton, VA 22079

Briery Creek Lake Pier and Parking Renovation project
Infrastructure
Results
Farmville, VA

VIMS Boat Ramp Replacement and Bulkhead Repair
Infrastructure
Results
Gloucester Point, VA

Pier 11 South Berth Expansion and Maintenance Dredging
Term Contract, Alteration
Results
$10,000,000 est. value
Norfolk, VA 23511

DCR Extensive Deck Repairs Bear Creek Lake State Park
Infrastructure
Results
Cumberland, VA 23040

Reported 04/15/2022 08:44 AM
Project Title

Debris Diverter Robious Landing Dock

Physical Address View project details and contacts
City, State (County) Midlothian, VA 23113   (Chesterfield County)
Category(s) Heavy and Highway
Sub-Category(s) Dock/Pier/Marine
Contracting Method Competitive Bids.
Project Status All Bids Rejected
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

For all labor, material, and equipment necessary to construct a pile supported debris diverter boom system to protect an existing floating dock from damage during raised river levels and moderate flood events.

Details

Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Marine Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents