Similar Projects
Laurens Road Swamp Rabbit Trail (SRT) - City of Greenville
Infrastructure
Conception
$1,500,000 est. value
Greenville, SC 29613

RFP - Architectural and Engineering Services
Term Contract
Conception
Lancaster, SC 29720

Shady Lane Force Main Replacement (SS7548) CDBE - Part 1
Infrastructure
Design
$661,770 CJ est. value
Columbia, SC 29206

Beattie Plant Sewer Extension
Infrastructure
Design
$300,000 CJ est. value
Fountain Inn, SC 29644

Lexington School District Four District Renovations
Renovation
Bidding
$300,000 CJ est. value
Swansea, SC 29160

Lexington School District Four District Renovations
Renovation
Bidding
$300,000 CJ est. value
Swansea, SC 29160

Signal Upgrades - District 4
Infrastructure
Sub-Bidding
$500,000 CJ est. value
Chesterfield, SC 29709

Signal Upgrades - District 4
Infrastructure
Sub-Bidding
$500,000 CJ est. value
Chesterfield, SC 29709

Classroom Libraries
Renovation, Term Contract
Post-Bid
Taylors, SC

New Highland Springs Elementary/Middle School - Phase 1
New Construction - 14,000 SF
Post-Bid
$1,000,000 to $5,000,000 CJ est. value
North Augusta, SC 29841

CMAR - Hilton Head Island Middle School Renovation
Renovation
Results
Less than $20,000,000 est. value
Hilton Head Island, SC 29926

Site Work And Renovations At The J. C. Boozer Recreation Complex
Renovation
Results
$750,000 est. value
Greenwood, Ninety Six, SC 29666

New West Ashley Center for Advanced Studies
New Construction - 100,000 SF
Construction
Charleston, SC 29414

Facilities New Construction Howard Adult Renovation and Mike Johnson Park Renovation
New Construction, Renovation
Construction
Less than $5,000,000 est. value
Georgetown, SC 29440

Limehouse Drive/Multi-Residential
New Construction, Infrastructure
Pending Verification
$18,000,000 CJ est. value
Summerville, SC 29485

Last Updated 08/08/2022 10:03 AM
Project Title

2022 Bond - Orangeburg County Schools

Physical Address View project details and contacts
City, State (County) Holly Hill, SC 29059   (Orangeburg County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Elementary School, Middle/Senior High School, Site Development
Contracting Method Competitive Bids
Project Status Obtained from a credible source, Awaiting verification, Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value $190,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Bond projects consist of: Construction of a new Orangeburg-Wilkinson High School. Construction of a new East Elementary School. Construction of a middle school wing at Lake Marion High School. Construction of a new Clark Middle School. Renovations and improvements to covert Howard Middle School to an Elementary School. Renovations and improvements for Edisto Primary School. Renovations and improvements for Elloree Elementary School. Renovations and improvements for athletic, auditorium, fine arts, parking lot, and playgrounds at various school facilities. As of July 26, 2022, this project is in the conceptual phase. The bond is expected to go for ballot on November 8 of 2022. An architect and a group of construction managers have been selected for the project. A firm timeline for construction has not been established. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Hardware, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Ice Machines, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Furniture, Office Furniture, Institutional Furniture, Classroom Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Site Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents