Similar Projects
Candlewood Suites
New Construction - 44,207 SF
Conception
Saint Augustine, FL 32092

Parrish Farms - Master Plan
New Construction - 4,000,000 SF
Conception
$10,000,000 CJ est. value
FL

Daily's Gas Station and Boos Development
New Construction - 109,200 SF
Design
Saint Johns, FL

Elevation Pointe
New Construction
Design
Saint Augustine, FL

SJC Fire Station 11 and Sheriffs Office Southwest Operations Center
New Construction, Infrastructure - 22,000 SF
Bidding
$9,398,300 CJ est. value
Elkton, FL 32033

Surfwood Subdivision Roadway and Drainage Improvements
Infrastructure
Bidding
$1,400,000 CJ est. value
Saint Augustine Beach, FL 32084

Beachwalk
New Construction - 33,856 SF
Post-Bid
$10,000,000 CJ est. value
Saint Augustine, FL

Tractor Supply #1240
Renovation - 22,589 SF
Post-Bid
$500,000 est. value
Saint Augustine, FL 32086

Two Car Garage Construction
New Construction
Results
Saint Augustine, FL 32084

Resurfacing - SR 206
Infrastructure
Results
$5,304,322 est. value
FL

Tribute by Marriott
New Construction
Construction
$12,000,000 est. value
Saint Augustine, FL 32080

Tribute by Marriott
New Construction
Construction
$12,000,000 est. value
Saint Augustine, FL 32080

Grand Cypress Marketplace
Demolition, New Construction, Infrastructure
Pending Verification
$20,000,000 CJ est. value
Saint Johns, FL 32259

Grand Cypress Marketplace
Demolition, New Construction, Infrastructure
Pending Verification
$20,000,000 CJ est. value
Saint Johns, FL 32259

The Approach at Ponte Vedra Beach
New Construction - 50,800 SF
Conception
Ponte Vedra, FL

Last Updated 12/29/2022 06:03 PM
Project Title

Cathedral Place Mixed Use Development

Physical Address View project details and contacts
City, State (County) Saint Augustine Beach, FL 32084   (Saint Johns County)
Category(s) Commercial, Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Hotel/Motel, Parking Garage, Paving/Reconstruction, Retail, Site Development, Swimming Pool(s)
Contracting Method Bids by Invitation
Project Status Construction start expected December 2029
Bids Due View project details and contacts
Estimated Value $10,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project scope consists of renovations to for a Marriott or Hilton hotel, including a new rooftop pool as well as the new construction of retail buildings on east side and north sides of the building at 22 and 24 Cathedral Place. Scope details have not been released. As of December 29, 2022 the project is in planning stage and seeking an opinion of appropriateness from the Historic Architectural Review Board. The project was continued by the board at its October 20, 2022 meeting. Information regarding the architect, general contractor and method of selection has not been disclosed. Construction is expected to begin in 2029 at the earliest.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

8 Stories Above Grade, Renovation, Renovation. 1 Story Above Grade, Parking Spaces, 100 Parking Spaces. 3 Stories Above Grade, New Construction, New Construction.
Division 01 - General Requirements, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Construction Aids, Temporary Scaffolding and Platforms.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete, Concrete Finishing, Precast Structural Concrete, Precast Concrete Slabs.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Buildings, Steel Joist Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Sheet Metal Waterproofing, Thermal Insulation, Weather Barriers, Built-Up Bituminous Roofing, Flashing and Sheet Metal, Joint Sealants.
Division 08 - Openings, Doors and Frames, Metal Frames, Metal Doors, Wood Doors, Plastic Doors, Special Function Doors, Cold Storage Doors, Panel Doors, Sectional Doors, Entrances and Storefronts, Entrances, Automatic Entrances, Sliding Automatic Entrances, Windows, Door Hardware, Mirrors.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Wall Coverings, Acoustic Treatment, Painting and Coating, Painting, Exterior Painting, Interior Painting, Special Coatings, Cementitious Coatings.
Division 10 - Specialties, Signage, Telephone Specialties, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Metal Storage Shelving, Flagpoles.
Division 11 - Equipment, Vehicle and Pedestrian Equipment, Loading Dock Equipment, Commercial Laundry and Dry Cleaning Equipment, Maintenance Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Window Blinds, Curtains and Drapes, Casework, Furnishings and Accessories, Rugs and Mats, Office Furniture, Hospitality Furniture, Site Furnishings, Trash and Litter Receptacles.
Division 13 - Special Construction, Swimming Pools, Recirculating Gutter Systems, Swimming Pool Accessories, Swimming Pool Cleaning Equipment.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers, Pool and Fountain Plumbing Systems, Swimming Pool Plumbing Systems.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Medium-Voltage Electrical Distribution, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Underwater Lighting, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Area Lighting, Site Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Earth Moving, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents