Similar Projects
Park Eden - Clean and/or Repair Unit Entry Doors
Post-Bid
Cincinnati, OH

Evanston: Replace Base Board Heaters
Post-Bid
Cincinnati, OH

Z--Replace Operating Room Chillers 539-18-203
Results
$5,000,000 to $1,000,000 est. value
Cincinnati, OH

Westwood Campus (formerly Mercy) Window and Door Replacement
Results
Less than $1,600,000 est. value
Cincinnati, OH

Locksmith Services- Citywide
Term Contract
Post-Bid
OH

Cincinnati State - Energy Efficiency Boiler Conversion Project
Results
Less than $2,600,000 est. value
Cincinnati, OH

Installation of Laboratory Casework, Laboratory Service Fittings
Post-Bid
Cincinnati, OH 45221

Clifton Elementary School Window Replacement
Results
Cincinnati, OH

Aluminum Entry Door Replacement
Term Contract
Post-Bid
Cincinnati, OH 45202

Evanston - Clean and/or Repair Unit Entry Doors
Results
Cincinnati, OH

Justice Center Water Heater Replacement 2019
Post-Bid
Less than $113,000 est. value
Cincinnati, OH 45202

Evanston: Replace Mechanical Room Exterior Doors
Results
Cincinnati, OH

Replacement of the Windows in Turner Hall
Post-Bid
Less than $2,200,000 est. value
Cincinnati, OH 45221

Paul Brown Stadium Point of Sale System Replacement
Results
Less than $1,050,000 est. value
Cincinnati, OH 45202

Park Eden: Suspended Ceiling Replacement
Results
Cincinnati, OH

Last Updated 08/23/2019 12:52 PM
Project Title

Evanston - Water Pipe Insulation Replacement

Physical Address View project details and contacts
City, State (County) Cincinnati, OH 45207   (Hamilton County)
Category(s) Single Trades
Sub-Category(s) Finishes/Interior, Mechanical, Windows/Doors
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description 1. Install new pipe insulation on all domestic cold water, hot water and hot water circulation piping above the drop ceiling on entire the first floor, in the community areas (lobby, game room, meeting area, vestibule, adjacent corridors, etc.) a) See specification 220719 at the end of this RFq. b) There is approximately 1,500 linear feet of pipe. The contractor shall verify the exact linear footage of insulation needed, in order to successfully complete this project. 2. This project will not include pipes above the ceiling in the west wing residential corridor. a) The door to that corridor will be the boundary of the community space
Details
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes.
Division 22 - Plumbing, Electric Domestic Water Heaters.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents