Similar Projects
US 69 - Highway Improvement
Infrastructure
Bidding
$66,382,022 est. value
TX

Annual Road Resurfacing Contract
Term Contract
Post-Bid
Port Arthur, TX 77641

Road Rehabilitation
Post-Bid
China, TX

Southern Region Disaster Recovery Support BPA
Results

Griffing Road Asphalt Resurfacing Project
Results
Beaumont, TX 77701

Asphalt Road Reconstruction
Post-Bid
Groves, TX

Piney Point Lane Asphalt Resurfacing Project
Results
Less than $250,000 est. value
Beaumont, TX 77701

Concrete Pavement Rehabilitation 2020 Debt Project
Post-Bid
Port Neches, TX

Pine Street Asphalt Resurfacing Project
Results
Less than $524,598 est. value
Beaumont, TX 77703

5th and 6th Streets Roadway Pavement Rehabilitation
Post-Bid
Port Arthur, TX

Sherwood Drive Asphalt Resurfacing Project
Results
Less than $598,219 est. value
Beaumont, TX 77701

Installation Of Asphalt Topping Over Existing Limestone Road
Alteration - 35,000 SF
Post-Bid
Beaumont, Port Arthur, TX 77642

Old Voth Road Asphalt Resurfacing Project
Results
Less than $837,241 est. value
Beaumont, TX 77701

2021 HMAC Street Program
Infrastructure
Post-Bid
Port Neches, TX

Ov - Overlay
Results
Less than $5,450,697 est. value
TX

Last Updated 09/02/2021 05:12 AM
Project Title

South 23rd Street Roadway Rehabilitation Project

Physical Address View project details and contacts
City, State (County) Beaumont, TX 77725   (Jefferson County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $172,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This work shall include: 1. Mobilization. 2. Remove existing Concrete Pavement with Curb and Gutter and stabilized or un-stabilized base to the correct grade and elevation. Reconstruct Concrete Pavement and Curb and gutter as shown in the plans. Remove and replace existing Curb inlets and other Storm Sewer Structures as called out in the plans. Construct new drainage ditches and improve existing drainage ditches consisting of the removal of trees, bushes, excavation and shaping as shown in the plan set and following the cross-section design for the LT & RT ditch shown in the plans, all depths, including maintaining shown flow direction, surface restoration, hydro-seeding, and all appurtenances, all in strict accordance with the plans and specifications. 3. Cement stabilized sand backfill used for the 24” HDPE pipe will be from the top of pipe to the top of the Natural Ground above. For all other areas native soils may be used as final backfill to match surrounding natural ground. Sod or Hydro-Mulch will be used for final stabilization.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents