Similar Projects
Removal and Replacement of Resin Filter Media
Renovation
Bidding
$145,000 est. value
Ayer, MA

Whitney Pond Wells Water Treatment Plant - Sub-Bids
New Construction
Post-Bid
$8,000,000 est. value
Groton, MA

Granular Activated Carbon Filter Media Exchange
Renovation
Post-Bid
Cambridge, MA

Patton Water Treatment Plant & Shabokin Water Treatment Plant - Filed Sub Bids
Results
$23,300,000 est. value
Devens, MA

Whitcomb Avenue Water Treatment Plant - General Bids
Results
Less than $15,900,000 est. value
Littleton, MA

Patton Water Treatment Plant & Shabokin Water Treatment Plant - General Bids
Construction
Less than $23,300,000 est. value
Devens, MA

MacPherson Well PFAS Water Treatment Plant (WTP) Project - General Bids
Results
$2,229,889 est. value
Devens, Shirley, MA 01464

Whitcomb Avenue Water Treatment Plant - Filed Sub Bids
Results
Less than $15,900,000 est. value
Littleton, MA

MacPherson Well PFAS Water Treatment Plant (WTP) Project - Filed Sub Bids
Results
$1,300,000 est. value
Devens, Shirley, MA 01464

John J. Carroll Water Treatment Plant Scada System Improvements - General Bids
Renovation
Results
$13,900,000 est. value
Marlborough, MA 01752

Membrane Bioreactor Treatment System
New Construction
Results
Littleton, MA

Chestnut Street PFAS Treatment System - General Bids
New Construction
Results
$2,900,000 est. value
Hudson, MA 01749

Chestnut Street PFAS Treatment System - Filed Sub Bids
New Construction
Results
$2,900,000 est. value
Hudson, MA 01749

Tyngsborough Wellfield Water Treatment Plant - Filed Sub-Bids
Alteration
Results
$9,850,000 est. value
Dracut, MA

Tyngsborough Wellfield Water Treatment Plant - General Bids
New Construction - 7,468 SF
Results
$9,850,000 est. value
Dracut, MA

Last Updated 05/06/2022 02:49 AM
Project Title

Whitney Pond Well 3 Chemical Feed & Control Facility - General Bids

Physical Address View project details and contacts
City, State (County) Groton, MA   (Middlesex County)
Category(s) Sewer and Water
Sub-Category(s) Water Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $300,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

DCAMM Certificate. The work for this project consists of constructing a chemical feed and control facility for a 450 gpm well. The well, pitless adapter and well pump will be installed by others under a separate contract. The work includes furnishing and installing a VFD for the well pump with associated ancillary systems; chemical feed systems; instrumentation and controls; pipe and appurtenances; and minor site improvements inclusive of a gravel road. The wood frame structure has been constructed by others; the work includes furnishing and installing insulation and interior finishes.

Details

Division 02 - Existing Conditions, Geotechnical Investigations, Subsurface Drilling and Sampling.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Windows, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Safety Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment, Lifts.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Air Terminal Units.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Conveyors, Cranes and Hoists.
Division 44 - Pollution and Waste Control Equipment, Odor Treatment Equipment, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment, Common Work Results for Water and Wastewater Equipment, Water and Wastewater Preliminary Treatment Equipment, Water and Wastewater Chemical Feed Equipment, Water and Wastewater Clarification and Mixing Equipment, Water and Wastewater Secondary Treatment Equipment, Water and Wastewater Advanced Treatment Equipment, Water and Wastewater Residuals Handling and Treatment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents