Similar Projects
RFQ Engineering - UWMIL Central Heating Plant Chiller Replacement
Renovation
Conception
$13,360,000 CJ est. value
Milwaukee, WI 53202

Central Region AE IDIQ
New Construction, Term Contract
Design
$25,000,000 est. value

Contractor - Lead Private Service Line Replacement Program
Infrastructure
Design
Shorewood, WI

RFP Design - Adventure Africa Phase III Zoo Adventure Africa - Rhinos Exhibit
Infrastructure, Renovation
Bidding
$10,000,000 CJ est. value
Milwaukee, WI 53226

RFP Design - Zoo Humboldt Penguin Exhibit Enhancement
Renovation, Infrastructure
Bidding
$3,500,000 CJ est. value
Milwaukee, WI 53226

Engineering, Planning and Development
Post-Bid

Architect-Engineering (AE) Indefinite Delivery Contract (IDC) in Support of the Defense Health Agency (DHA) and Component Medical Commands
Post-Bid
Less than $45,000,000 est. value
Washington, DC

Water Tank Inspections, OCONUS and CONUS
Results
$10,000 to $5,000,000 est. value

NGB Fire Protection - National Architect and Engineering Indefinite Delivery Indefinite Quantity Contract
Results
$70,000 to $10,000,000 est. value
Washington, DC

RFP Engineering - Perpetuation - Resurfacing Howell Ave
Infrastructure
Pending Verification
$10,999,999 CJ est. value
Milwaukee, WI 53202

RFP Engineering - Perpetuation - Resurfacing Ryan Road
Infrastructure
Pending Verification
$10,999,999 CJ est. value
Milwaukee, WI 53202

C1JZ--National Region AE IDIQ
Post-Bid
$20,000,000 est. value

National Architecture/Engineering/Interiors (IDIQ) Contract
Results
Less than $25,000,000 est. value

RFP Design - Modernization - WASF facility
New Construction, Infrastructure
Pending Verification
$25,000,000 CJ est. value
Milwaukee, WI 53204

Engineering Services - Kinnickinnic River Reach 2 South 6th to 16th Street Final Design
Post-Bid
Milwaukee, WI

Last Updated 09/15/2022 05:34 AM
Project Title

RFP - IH 894 and IH 43

Physical Address View project details and contacts
City, State (County) West Allis, WI 53214   (Milwaukee County)
Category(s) Professional Services
Sub-Category(s) Engineering
Contracting Method Competitive Bids
Project Status Construction start expected January 2023 , Request For Proposals
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Transportation Region/Bureau: Southeast Region Solicitation ID: SE-02 Route : IH 041N County : 40 - Milwaukee County, 67 - Waukesha County Limit : Zoo, Mitchell & Moorland-hale Ics A Safety and Operational Needs Study is needed to evaluate corridor safety, capacity and operational needs, current asset condition and corridor needs thru 2050. The study will evaluate approximately 9.4 miles I-41/43 from Moorland Road to the Mitchell Interchange and approximately 4.5 miles of I-41 from the Zoo Interchange to the Hale Interchange in Milwaukee and Waukesha Counties. Increasing traffic volumes and freight movements are projected to result in moderate to severe traffic congestion on the corridor. The study will simulate existing and future no-build conditions to evaluate capacity and operational needs. Crash rates vary by location and will be considered when evaluating needed improvements. Pavement and bridge conditions will be coordinated with safety and capacity needs. The study will document needs for the corridor and make recommendations for future projects. Microsimulation modeling will simulate interactions between road users in existing and no-build model scenarios for the years 2030, 2040, and 2050 along the interstate system. The contract price will be based on an estimate of the selected consultants actual costs plus fixed fee. Actual costs will be defined as those costs allowable under the cost principles in Part 31 of Federal Acquisition Regulation (FAR). Consultant costs including indirect cost rates and cost accounting system will be subject to audit. Consultant firms that are unable to account for costs consistent with requirements of the FAR are not eligible to contract. Consultants selected will be required to either submit or have on file with WisDOT a Consultant Financial Report prior to contract execution. Information on the report may be found electronically. Advertised Fixed Fee %: 8.00 The fixed fee for this contract will apply an indirect cost factor of 150% to the consultants estimated direct labor, regardless of the consultant's actual indirect rate. Interview: Interviews will not be conducted The method of contractor selection has not been determined at this time. WisDOT - RFP - IH 894 and IH 43 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 31 - Earthwork.
Division 32 - Exterior Improvements.
Division 33 - Utilities.
Division 34 - Transportation.
Division 35 - Waterway and Marine Construction.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents