Similar Projects
RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Conception
$1,500,000 CJ est. value
Seattle, WA 98174

Northlake Entryway Monumentation
Infrastructure
Design
$400,000 CJ est. value
Northlake, TX 76247

Jefferson Grandscape
New Construction, Infrastructure - 10,000 SF
Design
$95,000,000 CJ est. value
The Colony, TX 75056

Phase 1 - Grading, Paving, and Utility Package for Stone Hill Ranch Estates
Post-Bid
TX

2021 Street Improvement
Post-Bid
Argyle, TX

Silverado West Phase 2 Paving Improvements
Results
Aubrey, TX

Bruton Orand Boulevard at FM 1171 - Right Turn Lane
Results
$252,742 est. value
Flower Mound, TX 75028

Velvet Taco - Grandscape
New Construction, Infrastructure - 2,388 SF
Construction
$1,000,000 CJ est. value
The Colony, TX 75056

Frost Bank Denton Financial Center
New Construction, Infrastructure - 5,200 SF
Construction
$6,000,000 CJ est. value
Denton, TX 76205

The Dove Church / Worship Center
New Construction, Infrastructure - 13,873 SF
Pending Verification
$5,000,000 CJ est. value
Southlake, TX 76092

McDonalds 042-3356 - Old Decatur Rd / Fort Worth
New Construction, Infrastructure - 4,456 SF
Pending Verification
$1,500,000 CJ est. value
Fort Worth, TX 76179

Tannery Lake Dam Reconstruction
Post-Bid
Denton, TX

Rehabilitate Existing Roadway and Add Shoulders
Results
Less than $7,848,270 est. value
TX

Kiddie Academy of Arlington
New Construction, Infrastructure - 11,131 SF
Construction
$2,500,000 CJ est. value
Mansfield, TX 76063

Canyon Falls - Village 9-AR - Earthwork Improvements
Post-Bid
Denton, TX

Last Updated 08/12/2022 09:12 AM
Project Title

Legacy Drive - (Panther Creek Parkway to PGA Parkway) Fields Parkway - (Teel Parkway to Dallas Parkway)

Physical Address View project details and contacts
City, State (County) Frisco, TX 75033   (Denton County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $105,775,722 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Questions must be received by to 2 pm, Friday, June 10, 2022. Questions received after this time will not be answered. WORK MUST BE COMPLETE IN FULL BY: i. BASE BID A: SEPTEMBER 1, 2023, LEGACY DRIVE ii. BASE BID B: DECEMBER 1, 2023, FIELDS PARKWAY. Liquidated damages are set at an amount equal to 5,000.00 per Calendar Day for the first thirty (30) Days of delay, an amount equal to $10,000.00 per, Calendar Day for the next thirty (30) Days of delay (Days 31-60), and an amount equal to $25,000.00 per Calendar Day for the each and every Day of delay thereafter (Days 61 and beyond) following the expiration of the applicable Contract Time for each Base Bid of the Work. The Project includes two Base Bids for the Work: Base Bid A: Legacy Drive between Panther Creek Parkway and PGA Parkway includes the following; This Project includes the grading, paving, 12’ hike & bike trail, storm drain including inlets, conspans, box culverts, and headwalls, an approximate 665 linear foot bridge over Panther Creek, traffic signals modification at PGA Parkway and Panther Creek Parkway, traffic signal at Fields Parkway, pedestrian tunnel, signing, pavement markings, 20” water line, 27” wastewater line, street lighting, multi-duct conduit, and median landscaping and irrigation. The Owner has pre-purchased specimen trees for the project and the contractor shall provide all necessary coordination for installation timing to meet schedule requirements. The quantities provided are estimates. The bid form unit pricing will prevail, based on actual quantities. This scope of Work will require a separate bid for accounting purposes. Base Bid B: Fields Parkway between Teel Parkway and the new Legacy Drive includes the following; This Project grading, paving, 12’ hike & bike trail, two roundabouts between Teel Parkway and Legacy Drive, storm drain including inlets, conspans, box culverts, and headwalls, traffic signals at Dallas Parkway, two pedestrian tunnels, signing, pavement markings, 24” water line, street lighting, multi-duct conduit, and median landscaping and irrigation. The Owner has pre-purchased specimen trees for the project and the contractor shall provide all necessary coordination for installation timing to meet schedule requirements. The quantities provided are estimates and the bid form unit pricing will prevail, based on actual quantities. This scope of Work will require a separate bid for accounting purposes.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Culverts, Ponds and Reservoirs, Storm Drainage Structures.
Division 34 - Transportation, Operation and Maintenance of Transportation, Transportation Signaling and Control Equipment, Roadway Signaling and Control Equipment, Traffic Signals, Traffic Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents