Similar Projects
Heber Meadows Apartments Residential Development / El Centro
New Construction, Infrastructure
Design
$108,633,600 CJ est. value
El Centro, CA 92243

Rock Hill Trail
Infrastructure
Bidding
$2,000,000 CJ est. value
Calipatria, CA 92233

New River Improvement Project - Calexico Reach
Infrastructure, Renovation
Bidding
$34,190,556 CJ est. value
Calexico, CA 92231

Drilling Services
Term Contract
Post-Bid
Calexico, CA

J09 Calexico Paystation Shade Structure
Infrastructure
Post-Bid
$300,000 CJ est. value
Calexico, CA 92231

Bombay Beach Townsite Roadway Improvement Project
Infrastructure
Results
$2,579,755 CJ est. value
Imperial, CA 92251

Orchard Road Improvements From State Route 7 to Alamo River
Infrastructure
Results
$1,535,069 CJ est. value
Holtville, CA 92250

Rehabilitate Bridges, Concrete Barriers, Terminal Systems, Electrical
Infrastructure
Bidding
$6,500,000 CJ est. value
Calipatria, CA 92233

Calexico West Land Port Of Entry Phase 2B
New Construction, Infrastructure
Post-Bid
$93,000,000 CJ est. value
Calexico, CA 92231

Imperial County Behavioral Health Parking Lot and Site Improvements
Infrastructure
Results
$377,007 CJ est. value
El Centro, CA 92243

Mcgee Park Phase 3 Project
Infrastructure
Bidding
$200,000 CJ est. value
El Centro, CA 92243

CEQA-NEPA Compliance Services for the R-Line 92kV Transmission Line Upgrade Project
Infrastructure
Post-Bid
$500,000 CJ est. value
Imperial, CA 92251

Final Closure of the Hot Spa Solid Waste Site
Infrastructure
Results
$1,400,800 CJ est. value
Brawley, CA 92227

Tennis Courts Replacement, Shades, and New Lighting
Infrastructure
Bidding
$1,900,000 CJ est. value
Imperial, CA 92251

Utility Scale Energy Storage System 100 MW
Infrastructure
Post-Bid
$300,000 CJ est. value
Imperial, CA 92251

Last Updated 11/07/2022 10:08 AM
Project Title

Rockwood Avenue Fourplex

Physical Address View project details and contacts
City, State (County) Calexico, CA 92231   (Imperial County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Multi-Family Homes, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $1,500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the construction of a fourplex. As of November 7, 2022, this project is pending approval of a variance. While a firm construction timeline has not yet been established, construction is expected to begin in the first quarter 2023. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

New Construction, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents