Similar Projects
Mid-Block Crossing U City
Infrastructure
Conception
$1,000,000 CJ est. value
Philadelphia, PA 19104

I-95: Betsy Ross Main Lane NB
Infrastructure
Conception
$287,800,000 CJ est. value
Philadelphia, PA 19106

Byberry North Business Center
New Construction, Infrastructure - 656,904 SF
Design
$320,000,000 CJ est. value
Philadelphia, PA 19116

Conshohocken Avenue Mixed-Use Residential Development
New Construction, Infrastructure
Design
$100,000,000 CJ est. value
Philadelphia, PA 19131

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Jenkintown-Pennypack Trail
Infrastructure
Bidding
$2,500,000 CJ est. value
Philadelphia, PA 19152

Aqua 1" Twin Meter Pit With Back Flow
Infrastructure
Post-Bid
Philadelphia, PA

Emergency Generator and Fire Pump Maintenance Services
Term Contract
Post-Bid
Philadelphia, PA 19107

Water, Sewer, and Basement Protection Plumbing Repairs
Term Contract, Infrastructure
Results
$100,000 est. value
Philadelphia, PA

Relay of Water Mains, Reconstruction of Sewers in Hope Street
Infrastructure
Results
$2,000,000 to $3,000,000 est. value
Philadelphia, PA 19176

Crown 95 Logistics Center / Philadelphia
New Construction, Infrastructure - 381,200 SF
Construction
$205,000,000 CJ est. value
Philadelphia, PA 19134

5th + Spring Garden
New Construction, Infrastructure - 15,320 SF
Construction
$200,000,000 CJ est. value
Philadelphia, PA 19123

Spruce Street Mixed-Use Development
New Construction, Infrastructure - 149,500 SF
Pending Verification
$75,000,000 CJ est. value
Philadelphia, PA 19139

Callowhill Apartments
New Construction, Infrastructure - 213,115 SF
Pending Verification
$80,000,000 CJ est. value
Philadelphia, PA 19123

Washington Lane Corridor Safety Improvements
Infrastructure
Conception
$775,000 CJ est. value
Philadelphia, PA 19138

Last Updated 03/02/2023 11:04 AM
Project Title

Construction of Green Stormwater Infrastructure in Baynton Street From E. Clapier St to Shedaker St

Physical Address View project details and contacts
City, State (County) Philadelphia, PA 19144   (Philadelphia County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $1,529,220 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

As of March 2, 2023, project is pending award. A timeline for award has not been confirmed. Construction of Green Stormwater Infrastructure in Baynton St From E. Clapier St to Shedaker St (Est. $1,000,000 to $2,000,000) No quotes will be accepted unless a Questionnaire and Financial Statement for Qualified Sellers with all questions fully answered is filed with portal on or before Tuesday, May 17, 2022 In Lieu of prebid meeting, any questions should be emailed to Jessica.Musti@phila.gov by Friday, May 20, 2022. These Bids require Compliance with Office of Economic Opportunity. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. MBE- 17% - 20% and WBE- 10% - 13% This work includes all work necessary to install complete and fully usable green stormwater infrastructure surface and sub-surface features in the project areas as shown and described in the Contract Documents. In general, the work includes sawcutting and removal of existing sidewalk and paving; excavation of trenches and disposal of material; excavation and grading of rain gardens, stormwater bumpouts and swales; installation of check dams and spillways; installation of clean washed stone and geotextile; installation of thermoplastic, ductile iron and RCP drainage pipe and fittings, cleanouts and riser structures; installation of energy dissipaters; installation of observation wells; installation of trench drains and concrete aprons; installation of new stormwater inlets, control structures and laterals; installation and modification of existing inlets, restoration of sidewalks, curbs and streets; planting of trees and landscaping, and placement and grading of specified stormwater and planting soils. Completion- (150) CALENDAR days

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents