Similar Projects
Reported | 06/17/2021 12:00 AM |
Project Title | Transient Training HQ Building |
Physical Address | View project details and contacts |
City, State (County) | Fort McCoy, WI (Monroe County) |
Category(s) | Government/Public |
Sub-Category(s) | Military Facility |
Contracting Method | Design-Build. Competitive Bids. |
Project Status | Accepting Letters of Interest |
Bids Due | View project details and contacts |
Estimated Value | $10,000,000 to $25,000,000 |
Plans Available from | Federal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The proposed project is a Design/Bid/Build for the construction of a new 23,000 SF Transient Training Brigade Headquarters (TT BDE HQ) based on the denser, more consolidated footprints of Fort McCoy's Troop Housing Area Development Plan. The floor plan will be based on the Operational Readiness Training Complex (ORTC) standard design and additional square footage has been included in this project to accommodate stair/elevator access to the second floor. The facility will be deactivated and/or taken off-line during the winter months when necessary. When Fort McCoy is not stood-up as a mobilization platform, its primary mission is to support the seasonally driven requirement(s) of transient training. Deactivation of buildings during the winter months conserves energy and cuts utility costs. Project will include information systems, fire protection and alarm systems, video surveillance system, and Energy Monitoring Control Systems (EMCS) connection. Supporting facilities include site development, utilities and connections, lighting, paving, parking, walks, curbs and gutters, storm drainage, information systems, landscaping and signage. Heating and air conditioning will be provided by a self-contained system. Comprehensive building and furnishings related interior design services are required. Accessibility for the disabled will be provided. Antiterrorism force protection and physical security measures will be incorporated into the design including maximum standoff distances from roads, parking areas and vehicle unloading areas. Sustainability/Energy measures will be provided. Facilities will be designed to a minimum life of 40 years in accordance with DoD's Unified Facilities Criteria (UFC 1-200-02) including energy efficiencies, building envelope and integrated building systems performance. |
||||||||||||||||||||||||||||||||||||
Details | 1 Military Facility, Approximately 23,000 SF New Construction.
|
||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |