Similar Projects
Cross Connection Devices
Bidding
Denver, CO

Advance Metering Infrastructure (AMI) System
Bidding
Thornton, CO

Wise Binney Connection Pipeline
Post-Bid
$19,000,000 est. value
Aurora, CO 80111

2020 Sacwsd Water System Removal and Replacements Phase 1
Post-Bid
Commerce City, CO

Water Softening Project 24 Inch Transmission Line
Results
Commerce City, CO

Baseline Waterline and North Tank Drainage Construction Project
Results
Brighton, CO

2020 SACWSD Water System Removal and Replacements Phase 2
Post-Bid
Commerce City, CO 80022

36-Inch Gun Club Rd. Pipeline from E. 26th Ave. to E. 56th Ave
Results
$7,500,000 to $8,100,000 est. value
Aurora, CO 80012

Buckley AFB, Co - Repair & Replace Fire Hydrants
Post-Bid
$1,000,000 to $5,000,000 est. value
Aurora, CO

Notice of Request for Contractor Qualifications
Term Contract
Results
Thornton, CO 80229

Vault and Valve Rehabilitation Program
Post-Bid
$190,000 to $200,000 est. value
Aurora, CO 80012

2020 Hydrant Preventive Maintenance
Results
Less than $75,000 est. value
Commerce City, CO 80022

General Pipeline Maintenance Services Standley Lake Pipeline
Post-Bid
Thornton, CO

Havana Street 30 Inch Water Line Renewal
Results
$2,250,000 to $3,000,000 est. value
Aurora, CO 80012

Reservoir Above Water 72 Inch Vault and East Tee (Prime Contractors)
Post-Bid
Less than $2,000,000 est. value
Aurora, CO

Last Updated 03/27/2020 12:12 PM
Project Title

60-Inch Gun Club Road Pipeline From East 6th Avenue to I-70

Physical Address View project details and contacts
City, State (County) Aurora, CO 80012   (Adams County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,800,000 to $3,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

New 60-inch pipeline that connects to an existing 36-inch water main at E. 6th Ave. and proceeds north through city right-of-way east of Gun Club Rd., under I-70 via a 430-foot-long tunnel to an existing 30-inch water main adjacent to Furniture Row. The pipeline is approximately 7,100 lineal feet in length.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents