Similar Projects
Kasmiersky Trail Rehab
Infrastructure
Bidding
Conroe, TX 77304

Parking Lot Expansion - Pardes Campus
Post-Bid
Spring, TX 77381

Construction of Vivace at Harmony Phase 3 - Sitework, Planting, and Irrigation
Term Contract, Infrastructure
Post-Bid
TX

Sidewalk Extension Along Birnham Woods Drive
Results
TX

Traffic Signal - Loop 336 at Montgomery Park Boulevard
Results
$300,000 est. value
Conroe, TX 77301

Traffic Signal Modifications
Construction
Magnolia, TX 77449

Agriculture Complex Meat Lab Parking Lot
Alteration
Post-Bid

Grand Central Park Town Park Drive Streetscape Phase II
Results
Conroe, TX 77304

Alligator Creek Hike and Bike Trail
Results
Less than $510,000 est. value
Conroe, TX 77301

Grand Central Park - Grand Central Parkway Streetscape Phase II
Results
TX

Traffic Signal Foundation Services Various Precincts
Term Contract
Results
Less than $26,985 est. value
TX

Candy Cane Park - Senior Center Parking Lot
Results
$273,000 est. value
Conroe, TX 77301

Granger Pines Left and Right Turn Lanes and Traffic Signal Installation
Results
Conroe, TX 77302

South Pine Lake Road and SH 105 Signal Improvements
Results
Conroe, TX 77303

Sidewalk Improvements - Metcalf, Loop 336, Hicks and River Pointe
Infrastructure
Results
$412,000 est. value
Conroe, TX 77306

Last Updated 10/19/2021 10:36 AM
Project Title

Construction of Sidewalk and Traffic Signal Installation at Ladera Creek Trace and Loop 336

Physical Address View project details and contacts
City, State (County) Conroe, TX 77301   (Montgomery County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot, Traffic Signalization
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $375,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project is located east of FM 1314 and east of Little Caney Creek at the intersection of TX East Loop 336 and Ladera Creek Trace. It is located in Montgomery County Municipal Utility District No. 148 in Montgomery County, Key Map No. 188N.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Transportation Signaling and Control Equipment, Roadway Signaling and Control Equipment, Traffic Signals, Traffic Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents