Similar Projects
Commerce Way Streetscape Improvements
Infrastructure
Bidding
Tifton, GA 31794

Parking Lot Resurfacing/Paving
Infrastructure
Bidding
Calhoun, GA 30701

CVS #4740 Partial ADA Project
Renovation
Post-Bid
Smyrna, GA 30080

Hardy Road Curb and Gutter Project
Post-Bid
Lookout Mountain, GA 30750

Jesters Creek Trail Phase III
Results
Morrow, GA 30260

Tarboro Fire Station 18 Parking Lot
Results
White Oak, GA 31568

CVS #4717 Partial ADA Project
Renovation
Construction
$38,000 est. value
Atlanta, GA 30311

Rooms To Go Drive Addition
Alteration
Construction
$180,000 est. value
Atlanta, GA 30305

SR 124 / Scenic Highway at Jackson Street / New Hop
Term Contract
Bidding
Lawrenceville, GA

General Infrastructure Construction Services for Minor Projects
Post-Bid
Marietta, GA

Jekyll Island Beach Crossover Construction
Results
Brunswick, GA 31527

Construction Services - Pineview Trail Project
Infrastructure
Bidding
$200,000 est. value
Powder Springs, GA

2021 CDBG Sidewalk and Drainage Improvements
Post-Bid
McDonough, GA

Upgrade of the Battlefield Parkway Multi-Use Trail
Results
$695,132 est. value
Fort Oglethorpe, GA 30742

Milling and Paving of all Middle School Parking Lots
Infrastructure
Bidding
Eastman, GA 31023

Reported 05/14/2022 12:00 AM
Project Title

Walking Trails At Cherokee 75 Corporate Park

Physical Address View project details and contacts
City, State (County) Acworth, GA 30102   (Cherokee County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of creating walking paths and installation of benches, stripping, and pedestrian railing, concrete stairs, concrete side-walk, signage, prefabricated foot bridge and deconstruction and construction of access ramps and removing and replacing 4 trees. Additionally, and as an option, the installation of trees where designated and the replacement of rock for concrete on the paths walking around ponds.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents