Similar Projects
Morrison Ridge Shopping Center
New Construction, Infrastructure - 765,000 SF
Conception
$76,500,000 est. value
Concord, NC 28027

Concord Farms Realignment - City of Concord
Alteration
Conception
$4,000,000 est. value
Concord, NC 28027

Davidson Highway Industrial
New Construction, Infrastructure - 139,800 SF
Design
$75,000,000 CJ est. value
Concord, NC 28027

Red Bull Manufacturing and Distribution Center
New Construction, Infrastructure - 1,400,000 SF
Design
$740,000,000 CJ est. value
Concord, NC 28027

Rob Wallace Park Phase 2B Improvements
Infrastructure
Bidding
$1,200,000 CJ est. value
Midland, NC 28107

2023 Resurfacing Project
Infrastructure
Bidding
$286,000 CJ est. value
Kannapolis, NC 28083

Substation T
Infrastructure
Post-Bid
Concord, NC

Road Improvements for New Roberta Road Middle School
Infrastructure
Post-Bid
Concord, NC 28027

North End Around Taxiway (Neat) - Private Access Drive Construction
Infrastructure
Results
Charlotte, NC

Rowan-Cabarrus Community College South Campus Parking Lot Repairs
Infrastructure
Results
Concord, NC

R. Brown McAllister Elementary School - Early Release Packages
New Construction, Infrastructure - 116,000 SF
Construction
$37,000,000 CJ est. value
Concord, NC 28025

Christenbury Village
New Construction, Infrastructure - 102,000 SF
Construction
$94,000,000 CJ est. value
Concord, NC 28025

Lakeshore Corporate Park
New Construction, Infrastructure - 660,000 SF
Pending Verification
$49,000,000 CJ est. value
Kannapolis, NC 28082

Lakeshore Corporate Park
New Construction, Infrastructure - 660,000 SF
Pending Verification
$49,000,000 CJ est. value
Kannapolis, NC 28082

Roberta Road Middle School Sidewalk Extension - City of Concord
Infrastructure
Conception
$370,000 est. value
Concord, NC 28027

Last Updated 05/10/2023 02:13 PM
Project Title

Morrison Ridge Shopping Center

Physical Address View project details and contacts
City, State (County) Concord, NC 28027   (Cabarrus County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Shopping Center/Strip Mall, Sidewalks/Parking Lot, Site Development
Contracting Method Bids by Invitation
Project Status Conceptual Design, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $76,500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of May 10, 2023, this project is on indefinite hold and it is unknown when it will move forward. An architect and general contractor have not been selected. A construction timeline has been determined.

Details

765,000 SF. Parking Spaces, 3076 Parking Spaces.
Division 01 - General Requirements, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Construction Aids, Temporary Scaffolding and Platforms.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Buildings, Steel Joist Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Sheet Metal Waterproofing, Thermal Insulation, Weather Barriers, Built-Up Bituminous Roofing, Flashing and Sheet Metal, Joint Sealants.
Division 08 - Openings, Metal Frames, Metal Doors, Wood Doors, Plastic Doors, Special Function Doors, Cold Storage Doors, Panel Doors, Sectional Doors, Entrances and Storefronts, Entrances, Automatic Entrances, Sliding Automatic Entrances, Windows, Door Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Telephone Specialties, Compartments and Cubicles, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Metal Storage Shelving.
Division 11 - Equipment, Loading Dock Equipment.
Division 12 - Furnishings, Casework, Rugs and Mats, Office Furniture, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Area Lighting, Site Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents