Similar Projects
Taylors Creek Extension
Infrastructure
Bidding
Hinesville, GA

Water Meter Replacement
Infrastructure
Bidding
$500,000 est. value
McCaysville, GA

Russell Creek 30-inch Raw Water Pipeline
Post-Bid
Dawsonville, GA

Purchase of Water Meters on an Annual Contract
Post-Bid
Lawrenceville, GA

First Street Resurfacing, Street, Water Extension
Results
Richmond Hill, GA 31324

2019 CDBG Water System Improvements
Results
Milan, GA 31060

Water System Improvement - Materials Only
Infrastructure
Bidding
Ludowici, GA

Automated Metering Infrastructure
Post-Bid
Temple, GA

New Water Meter Installation Project
Results
Less than $1,960,250 est. value
Gainesville, GA 30501

Georgia War Veterans Home Site Infrastructure
New Construction, Infrastructure
Bidding
$700,000 est. value
Milledgeville, GA 31061

Installation of Water and Wastewater Infrastructure
Term Contract
Post-Bid
GA 31543

Dunbar Road Water Main Extension
Results
Warner Robins, GA 31095

2023 Blow-Off Replacements
Infrastructure
Bidding
$2,000,000 est. value
Marietta, GA

Water Main and Sewer Main Improvements
Infrastructure
Post-Bid
Blakely, GA

Lanier Filter Plant and Shoal Creek Filter Plant High Service In-Line Ultrasonic Flow Meter Installations
Results
Buford, GA 30518

Last Updated 06/24/2022 01:22 AM
Project Title

Hills and Dales Force Main Improvements

Physical Address View project details and contacts
City, State (County) Lagrange, GA   (Troup County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Work to be performed under Contract A - 2022 Hills & Dales Force Main Improvements include the following: 4,140 LF of 6" HDPE, DR 11 (DIPS) Force Main, See Plans for Actual Depth, Open Cut or HDD Construction, Complete per Plans, 1,290 LF of 6" HDPE, DR 11 (DIPS) Force Main, See Plans for Actual Depth, HDD Construction as noted, Complete per Plans. 1 LS 6" Force Main Discharge Piping and 5' Diameter Manhole, Complete per Plans and Detail C590, 3 EA 1" Combination Air Valve Assembly with Backwash Accessories and 5' Dog-House Manhole, Complete per Plans and Detail C600, 1 LS Erosion Control Plan Requirements, Complete per Plans, 1 LS Mobilization, 1 LS Demobilization, The General Project Items Includes extra Bid Items to be used only if approved by the Engineer for Payment. The Project Also Includes the required excavation, backfill, grading, testing and all other appurtenances and accessories.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 09 - Finishes.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 31 - Earthwork.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents