Similar Projects
Last Updated | 10/09/2021 04:00 AM |
Project Title | 2021 - Miller Intersection and Curve Reconstruction |
Physical Address | View project details and contacts |
City, State (County) | MO (Jefferson County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Work includes: Miller Road @ Spring Forest Intersection - Phase 1 - will be reconstructed with a new horizontal and vertical alignment at the intersection of Spring Forest Road. The project length on Miller Road is 600' and 364' on Spring Forest. The project includes but not limited to new 12' lanes that consists of 4" base rock, 8" of bituminous asphalt base, and 2" asphalt wearing surface. group A piping, guardrail, and striping.Miller Road Curve Alignment - Phase 3 - will be reconstructed with a new vertical alignment with a super elevated roadway, closed drainage with curb inlets with cross pipe replacements, new concrete curb and gutter sections with new driveway entrances. The project length is 720' along Miller Road. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |