Similar Projects
Resurface and Add Shoulders Route
Infrastructure
Bidding
$5,000,000 to $7,500,000 est. value
MO

Cherry Lane Improvements project
Infrastructure
Bidding
Festus, MO

University Drive , Grobman Road and North Campus West Drive Paving
Infrastructure
Post-Bid

Athena Parking Lot Paving and Crack Fill 2021
Infrastructure
Post-Bid
De Soto, MO 63020

Sunridge Park Asphalt and Sealing Project 2021
Results
Hillsboro, MO 63050

2021 Mill, Mat and Asphalt Overlay Program
Results
Festus, MO

Old Lemay Ferry Road Intersection Improvements
Infrastructure
Bidding
MO

High School Parking lot Paving 2021
Infrastructure
Post-Bid
De Soto, MO 63020

2021 - Subdivision Asphalt Overlay
Results
$146,500 est. value
MO

East Rock Creek Road
Infrastructure
Bidding
MO

High Ridge ES Asphalt
Infrastructure
Results
High Ridge, House Springs, MO

New Sugar Creek Road Pavement Preservation
Infrastructure
Results
MO

Northwest Boulevard Pavement Preservation
Infrastructure
Results
MO

Scenic Drive Paving
Infrastructure
Results
Festus, MO

Main Street House Springs Reconstruction
Infrastructure
Results
House Springs, MO 63051

Last Updated 10/09/2021 04:00 AM
Project Title

2021 - Miller Intersection and Curve Reconstruction

Physical Address View project details and contacts
City, State (County) MO   (Jefferson County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work includes: Miller Road @ Spring Forest Intersection - Phase 1 - will be reconstructed with a new horizontal and vertical alignment at the intersection of Spring Forest Road. The project length on Miller Road is 600' and 364' on Spring Forest. The project includes but not limited to new 12' lanes that consists of 4" base rock, 8" of bituminous asphalt base, and 2" asphalt wearing surface. group A piping, guardrail, and striping.Miller Road Curve Alignment - Phase 3 - will be reconstructed with a new vertical alignment with a super elevated roadway, closed drainage with curb inlets with cross pipe replacements, new concrete curb and gutter sections with new driveway entrances. The project length is 720' along Miller Road.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents