Similar Projects
Railroad Crossing Improvements
Post-Bid
Richmond, TX 77469

Inspection, Maintenance and Repair of Railroad Spurs
Term Contract
Post-Bid
Dallas, TX 75203

Rail Replacement - Northbound Track Outer Rail Braeswood Boulevard at Fannin Street
Results
Less than $1,119,907 est. value
Houston, TX 77000

Rail Restoration and Replacement Services
Results
Paris, TX 75460

Rail Construction Services
Post-Bid
Paris, TX 75460

Inspection, Preventative Maintenance and Repair of Railroad
Term Contract
Results
Dallas, TX 75212

BNSF - New Inspection Pit
New Construction
Post-Bid
Temple, TX

Informal - Railroad Repair Work BCT
Results
Less than $20,650 est. value
Houston, TX 77252

Inspection, Maintenance and Repairs of Rail System Fy21
Term Contract
Post-Bid
TX 75212

Railroad Repairs On A as Needed Basis for the Port of Houston Authority
Results
Houston, TX 77252

Upgrade Bridge Rail and MBGF
Results
Less than $2,891,115 est. value
TX

Railroad Track Inspection and Switch Maintenance
Results
$15,000 to $65,000 est. value
TX

Remove/Replace Bridge Rail
Results
Less than $296,919 est. value
TX

Remove/Replace Bridge Rail
Results
Less than $1,555,249 est. value
TX

SH 31 Industrial Park Rail Spur
Results
Corsicana, TX 75110

Last Updated 01/07/2021 12:36 PM
Project Title

Track Maintenance

Physical Address View project details and contacts
City, State (County) Houston, TX 77002   (Harris County)
Category(s) Transportation
Sub-Category(s) Railroad/Subway
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $3,664,332
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The current rail system has three (3) Rail Corridors (Red, Green and Purple) which consists of 23 miles of double track. This is a contract for maintenance/repair services associated with METRO’s Track System. The maintenance/repair work will be performed on METRO owned facilities: ballasted and embedded track sections, direct fixation track sections, yard track, manual and powered switches, street crossing panels, lubricator machines (and all associated equipment), expansion joints, bumping posts, rail encapsulation (rubber boots), track drains, flood gauges, and traffic buttons and reflectors. The maintenance/repair work will be performed on an as-needed basis. The specific work requirements will be identified in Work Authorizations to be issued by METRO.

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Coiling Doors and Grilles, Entrances and Storefronts, Windows, Special Function Windows, Security Windows, Access Control Hardware, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Directories, Signage, Telephone Specialties, Compartments and Cubicles, Toilet Compartments, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Protective Covers, Flagpoles, Pest Control Devices, Flags and Banners, Security Mirrors and Domes.
Division 11 - Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Art, Casework, Seating.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Packaged Generator Assemblies, Engine Generators, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Site Lighting, Walkway Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems, Intercommunications and Program Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Tactile Warning Surfacing, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 41 - Material Processing and Handling Equipment, Conveyors.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents