Similar Projects
Coliseum Medical Centers Freestanding Emergency Department
New Construction, Infrastructure
Conception
$11,928,250 CJ est. value
Bonaire, GA 31005

Install Construct Breakroom and Administrative Area Building 125
Addition, Demolition, Renovation, Infrastructure
Bidding
$25,000,000 CJ est. value
Robins AFB, GA 31098

UHZ113000 Building 231 Second Story Addition
Addition, Demolition, Infrastructure - 20,654 SF
Bidding
$25,000,000 CJ est. value
Robins AFB, GA 31098

Trellis Walk Full Depth Reclamation and Resurfacing
Post-Bid
Centerville, GA 31028

Hafley Park Parking Lot Paving
Infrastructure
Post-Bid
$50,000 est. value
Perry, GA 31069

Margie Dr & Osigian Blvd Intersection Improvements
Results
Warner Robins, GA 31088

SR 127/Houston Lake Road Widening
Infrastructure
Results
$4,349,369 est. value
Perry, GA 31069

CRH Healthcare Shell Building / Bonaire
New Construction, Infrastructure - 4,000 SF
Construction
$800,000 CJ est. value
Bonaire, GA 31005

Jack Link's Manufacturing Faculty
New Construction, Infrastructure
Pending Verification
$450,000,000 CJ est. value
Perry, GA 31069

RFQ - Downtown Mixed Use Facility
New Construction, Infrastructure
Pending Verification
$5,280,000 CJ est. value
Perry, GA 31069

RFP D/B - Sensory Rooms
New Construction, Infrastructure
Bidding
$600,000 CJ est. value
Perry, GA 31069

Community Development Parking Lot Paving
Infrastructure
Post-Bid
$50,000 est. value
Perry, GA

Houston Lake Drive Sidewalk
Infrastructure
Results
Perry, GA

Perry Fieldhouse Site Improvements
Infrastructure
Post-Bid
GA

Main Street Realingment
Infrastructure
Results
$654,356 est. value
Perry, GA

Last Updated 02/15/2023 07:10 AM
Project Title

Downtown Perry Sidewalk Replacement and Pedestrian Lighting

Physical Address View project details and contacts
City, State (County) Perry, GA 31069   (Houston County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $273,422 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

As of February 14, 2023. The project has been awarded with the amount of $273,422.30. The work to be done shall consist of furnishing all labor, equipment and materials necessary to remove existing concrete sidewalks and replace with brick sidewalks. Also part of this project will be the addition of pedestrian lighting along portions of Jernigan Street and Main Street in downtown Perry. Bonds: All bid bonds must be accompanied by a Bid Bond in an amount of not less than five percent (5%) of the bid amount. The successful bidder, if awarded the Contract, will be required to furnish a Performance Bond in the amount of one hundred percent (100%) of the Contract amount and a Payment Bond in the amount of one hundred percent (100%) of the Contract amount.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents