Similar Projects
Greensferry Stream and Floodplain Restoration Project
Infrastructure
Bidding
Atlanta, GA

290 Batesville Road Stormwater Project
Infrastructure
Bidding
Milton, GA 30004

Asphalt Trail and Drainage Projects
Infrastructure
Post-Bid
Milton, GA

4878 Long Island Drive Drainage Improvement
Results
Atlanta, GA 30342

Peachtree Dunwoody at Telford Place Roadway Improvement Project
Results
Sandy Springs, GA 30328

Interstate North Parkway TS170
Results
Sandy Springs, GA

Stacks Road over CSX Railroad - Abutment Wall Repairs and Roadway Drainage Improvements
Results
College Park, GA 30349

Hapeville CDBG Park Improvements
New Construction
Results
Hapeville, GA 30354

Loch Lomond Culvert Repair Expedited
Results
South Fulton, GA

Greensferry Stream and Floodplain Restoration
Infrastructure
Results
Atlanta, GA 31175

North Springs High School Baseball Outfield Slope Repair
Infrastructure
Results
Atlanta, GA 30328

980 Crest Valley Drive Stormwater Improvement
Infrastructure
Results
Atlanta, GA 30327

Bristolestone Court Drainage Improvement Project
Infrastructure
Results
Johns Creek, GA

Nancy Creek at Windsor Meadows Stream and Water Quality Improvements Project
Infrastructure
Results
$754,000 est. value
Sandy Springs, GA

Baseball Field Drainage For Milton And Northview High Schools
Infrastructure
Results
Johns Creek, Milton, GA 30004

Reported 04/14/2022 09:43 AM
Project Title

Ashbury Park Drive CMP Replacement Project

Physical Address View project details and contacts
City, State (County) Roswell, GA 30075   (Fulton County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status All Bids Rejected, Project to Rebid
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project involves the removal and replacement of approximately 26 linear feet of 30 inch corrugated metal pipe (CMP), located at 12270 Ashbury Park Drive, Roswell, GA.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents