Last Updated | 06/22/2023 03:04 PM |
Project Title | Emergency Generators Phase 2 Point of the Mountain Jordan Narrows Pump Station |
Physical Address | View project details and contacts |
City, State (County) | West Jordan, UT 84088 (Salt Lake County) |
Category(s) | Single Trades |
Sub-Category(s) | Electric |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected June 2023 |
Bids Due | View project details and contacts |
Estimated Value | $63,576 [brand] Estimate |
Plans Available from | County Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. This project will install emergency 45 KW electric power generator sets (GENSETs) at two Jordan Valley Water Conservancy District (JVWCD) sites to maintain essential functions in the event of electric utility failure. One is natural gas fueled. The other is liquid petroleum (propane) fueled. This project installs two pre-purchased 45 kw generator units at two respective JVWCD owned sites in Salt Lake County, Utah. All questions relative to this project prior to the opening of bids shall be directed to the Project Manager for the project. The two GENSETs and two associated automatic transfer switches will be provided by JVWCD and shall be installed by the contractor. JVWCD will provide natural gas fuel, propane tank(s), and propane fuel. GENSETs are presently stored at Jordan Valley Water Treatment Plant, 15305 South 3200 West, Herriman, Utah. The contractor will transport GENSETs to the job sites. The automatic transfer switches are stored at the respective project site for installation by the contractor. SITES OF WORK: Site One--Point of the Mountain Flow Control Structure 11905 North, 10600 West, Utah County, Utah (west side of frontage road, at Utah /Salt Lake County line) 45 kw, propane fueled, 120/208V Site Two---Jordan Narrows Pump Station, 17040 South 985 West. Bluffdale, Utah 45kw, natural gas fueled. 277/480V The Owner reserves the right to reject any or all bids, to waive any informality in a bid, and to make awards in the interest of the Owner. JVWCD project manager/contact person: David McLean, PE Telephone Number: (801) 680-6334 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The value range for this project is between $30,000 and $50,000. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |