Reported 11/06/2019 11:37 AM
Project Title

Crum Creek Pumping Station Improvements, Contract 1 - General Construction

Physical Address View project details and contacts
City, State (County) Rutledge, PA 19070   (Delaware County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method
Project Status Construction Commenced third quarter 2019
Bids Due View project details and contacts
Estimated Value $6,500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of the following general components: A. General 1. The existing Crum Creek Pumping Station is a wet well/dry well submersible station with a comminutor. The station has a capacity of 16 MGD and will need to stay in operation during the construction of the new pumping station. 2. The proposed Crum Creek Pumping Station includes the following: a. The station will be a self-cleaning trench submersible wet well with a capacity of 24 MGD. b. Supporting equipment includes a mechanical coarse screen, a screenings washer/compactor, a dumpster load-out conveyor, actuated slide gates, piping, valving, and a travelling bridge crane. c. The main structures include an Influent Chamber, a Control Building, Dumpster Pavilion, and the main pumping station superstructure including wet well, screening and bypass channels, valve vault and operating level. d. Supporting structures include a metering/bypass vault, and a valve vault. e. Existing utilities will be relocated to allow space for constructing the new pumping station. f. The proposed station will have to be constructed and operational before decommissioning and demolishing the existing pumping station. g. The work shall include all accessories, mechanical HVAC equipment, plumbing, instruments, electrical, controls and security provisions as indicated in the Contract Documents. h. The pumping station will be capable of pumping to both the existing 30-inch force main to the Crum Creek Interceptor, and a future force main that will connect to DELCORA’s Eastern Bypass Force Main. 3. Provide without additional compensation, any apparatus, material and labor not specifically mentioned in specifications or indicated on Drawings, that is necessary to complete or perfect any portion of work in a substantial manner and in compliance with requirements implied or intended in these Contract Documents. This includes materials, devices or methods peculiar to the apparatus or system provided.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.