Similar Projects
East Branch Streetscape - 5671 - City of Arroyo Grande
Infrastructure
Conception
$488,835 CJ est. value
Arroyo Grande, CA 93420

Corporation Yard Permimeter Fence Replacement - 1000509 - City of San Luis Obispo
Infrastructure
Conception
$450,000 CJ est. value
San Luis Obispo, CA 93401

Conservmart / San Luis Obispo
New Construction, Infrastructure - 3,711 SF
Design
$1,000,000 CJ est. value
San Luis Obispo, CA 93401

North Main Street Mixed-Use Development
New Construction, Infrastructure - 11,200 SF
Design
$5,000,000 CJ est. value
Templeton, CA 93465

Irrigation, Planting and Concrete Work
Infrastructure
Bidding
$1,190,000 CJ est. value
Oceano, CA 93445

E.A. French Park Parking Lot Maintenance
Alteration
Post-Bid
$110,000 est. value
San Luis Obispo, CA 93401

San Luis Obispo High School Modernization Project - Site Work Only
Renovation, Infrastructure
Post-Bid
$3,000,000 est. value
San Luis Obispo, CA 93401

EWWTP Well 3 Drilling
Infrastructure
Results
$587,085 CJ est. value
Elmira, CA 95625

EWWTP Well 3 Drilling
Infrastructure
Results
$587,085 CJ est. value
Elmira, CA 95625

Verde/Luneta/Ramona/Broad Sewer Replacement
Infrastructure
Construction
$1,360,489 CJ est. value
San Luis Obispo, CA 93401

Santa Rosa At Monterey Intersection Improvements
Infrastructure
Construction
$821,564 CJ est. value
San Luis Obispo, CA 93401

Idle Hands Mixed-Use Building
New Construction, Infrastructure - 8,424 SF
Pending Verification
$2,500,000 CJ est. value
San Luis Obispo, CA 93401

Park Fermé
New Construction, Infrastructure, Renovation - 6,873 SF
Pending Verification
$1,900,000 CJ est. value
Paso Robles, CA 93446

Serrano, Bressi, Dana Pipe Replacement - 1000093 - City of San Luis Obispo
Infrastructure
Conception
$1,300,000 CJ est. value
San Luis Obispo, CA 93401

Villaggio at San Luis Obispo
New Construction, Infrastructure - 350,000 SF
Design
$500,000,000 CJ est. value
San Luis Obispo, CA 93401

Last Updated 03/07/2023 11:17 AM
Project Title

RFQ D/B - Water Infrastructure Improvements

Physical Address View project details and contacts
City, State (County) San Luis Obispo, CA 93401   (San Luis Obispo County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Sidewalks/Parking Lot, Site Development, Storage/Water Tanks
Contracting Method Competitive Bids
Project Status Request for Qualifications, Construction start expected March 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $8,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Cal Poly is requesting Statements of Qualifications (SOQ) from interested qualified Design-Build General Contractors to provide design, preconstruction and design-build construction services for the Water Infrastructure Improvement Project. The delivery method for this Project is Collaborative Design-Build. This is a two-phased project delivery: Phase 1-Design & Pre-construction Services to define the Project; and Phase 2-Design-Build Construction Services to complete the design and construct the Project. There will be separate agreements for each phase. The Design-Build General Contractor will be selected on qualifications and proposed fees (a design competition is not utilized). PROJECT BACKGROUND: The 2035 Master Plan accounts for nearly 15,000 beds of student housing to accommodate the first and second year live-on requirements as well as maintaining housing for transfer and returning upper division students. To begin to meet this need, the University intends to design and construct three new student housing projects at the current North Mountain and K-1 parking sites and renovate six existing residential halls at the current South Mountain site. The University's 2020 Utility Master Plan describes how the infrastructure needs to be improved, including the water system, to meet the 2035 Master Plan. Presently, the water system cannot accommodate the future Housing projects, and it needs to be improved to meet the new demands. PROPOSED PROJECT ELEMENTS: The project includes: Design and construction of two new water storage tanks (1.1 MG total) and associated piping above K-1 Parking Lot. Demolish existing Reservoir #2. Design and construction a new Pump House #2 to accommodate the new water storage tanks. Multiple pumps with VFD's are desired. Demolish existing Pump House #2. Relocation of existing water line connecting the new Pump House #2 and the new water storage tanks. Remodel Pump House #1 to improve efficiency. PROPOSED PROJECT DELIVERY METHOD: The delivery method for this project is Collaborative Design-Build. The project will fully embrace the principles of collaboration and integrated project delivery that emphasizes a cooperative approach to problem-solving. The University expects the Collaborative Design-Build team, as part of the project team, to deliver this project by creating a culture of open and honest communication, utilizing team principles efficiently and effectively, and establishing a collaborative environment where the project team contributes its best efforts for the benefit of the project as a whole. SELECTION PROCESS: The University will use a phased approach to select the collaborative design-build general contractor team: the builder will be selected with an RFQ/RFP process, and then the University will work collaboratively with the selected builder to select the design architect/engineer, and subsequently, all other team members. This process selects the Collaborative Design-Builder on qualifications and proposed fees (a design competition is not utilized). REQUIRED QUALIFICATIONS OF THE PROPOSER The Design-Build General Contractor is required to be licensed in the state of California with a 'A' license and registered to bid public works with the California Department of Industrial Relations (DIR). All Respondents must be prequalified with the CSU oneday prior to the SOQ due date or their SOQ submission may not be reviewed.Each Respondent's prequalification rating must be greater than the amount listed in the Project Budget Section of this RFQ. For informationregardingprequalification, go to website and click on the link for PlanetBids. Direct any prequalification questions to the Trustees' Prequalification Administrator at cocm.prequal@calstate.edu

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Storm Drainage Utilities.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents