Similar Projects
Last Updated | 12/05/2022 04:17 PM |
Project Title | Construct a Railroad Sidetrack - 2022 Bond - City of Stevens Point |
Physical Address | View project details and contacts |
City, State (County) | Stevens Point, WI 54481 (Portage County) |
Category(s) | Heavy and Highway, Transportation |
Sub-Category(s) | Railroad/Subway, Site Development |
Contracting Method | Competitive Bids |
Project Status | Conceptual Design, Construction start expected November 2023 |
Bids Due | View project details and contacts |
Estimated Value | $4,100,000 [brand] Estimate |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Construct a railroad sidetrack on the southside of the existing CN mainline from approximately Burbank Road to approximately Brilowski Road including the installation of all necessary ballast, track, and switchgear. As of December 5, 2022, this project is in the planning phase. A bond referendum held on November 8, 2022 passed. An engineer has not been selected. Although a firm timeline for construction has not been determined, construction is not expected to start prior to December 2022. |
||||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |