Similar Projects
Electrical, Framing, Mechanical, Flooring,Plumbing, Drywall
Alteration
Design
San Francisco, CA 94128

Seal Beach Pump Station Replacement - Orange County Sanitation District
Renovation
Bidding
$78,923,000 CJ est. value
Seal Beach, CA 90740

Pure Water Monterey Groundwater Replenishment Project Injection Well Facilities, Phase 4 Project
Renovation
Bidding
Monterey, CA 93940

Butterfly Valves for Ramona Pipeline Valve Replacement
Infrastructure
Sub-Bidding
$1,500,000 CJ est. value
San Diego, CA 92101

Commercial Industrial Services (CIS) Pumps and Motors Repair
Term Contract
Sub-Bidding
San Diego, CA 92136

Rainbow CC - Kitchen Concrete Plumbing Services
Alteration
Post-Bid
$130,000 est. value
Fallbrook, CA 92028

Plumbing Services
Alteration
Post-Bid
Chino, CA

As Needed Plumbing Maintenance and Repair for Metropolitan`s Gene Pumping Pump Plant
Term Contract
Results
$240,000 est. value
Los Angeles, CA

Backflow Testing And Repairs
Alteration
Results
Richmond, CA

Phase 1A Water CIP
Infrastructure
Construction
$1,313,318 CJ est. value
Stockton, CA 95202

Lemoore Sanitary Sewer Lift Station 9
Infrastructure
Bidding
$3,950,000 CJ est. value
Lemoore, CA 93245

Irrigation Controller Replacement Project REBID
Renovation
Sub-Bidding
$75,000 CJ est. value
Santa Clarita, CA 91321

Industrial Plumbing Supplies
Alteration
Post-Bid
Sacramento, CA

As-Needed Plumbing and Drain Repair Services
Term Contract
Results
Santa Clara, CA

Oil Tank Suction System
Infrastructure
Bidding
$330,000 CJ est. value
Oceanside, CA 92058

Last Updated 08/14/2023 10:21 AM
Project Title

Pony Express Trail Bicycle, Pedestrian and ADA Improvements

Physical Address View project details and contacts
City, State (County) Camino, CA 95709   (El Dorado County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of bicycle and pedestrian improvements to Pony Express Trail from Sanders Drive to Sly Park Road. Specific improvements include approximately 1,100 linear feet of new sidewalk and 3,150 linear feet of widening existing sidewalk, 1.7 miles of Class II bike lanes, ADA ramps, 8 new solar powered flashing beacons, drainage improvements, and improved delineation. Performance, construction or installation of other items or details not mentioned above, that are in the Plans, Standard Plans, Standard Specifications, or these Special Provisions. The award of Contract, if it will be awarded, will be to the lowest responsive Bidder whose Proposal complies with all the requirements prescribed. Owner reserves the right to award; BASE BID or ADDITIVE ALTERNATIVE BID A with the BASE BID or reject all bids. The Contract will be awarded based upon the total bid for both the Base Bid and Additive Alternative Bid A. The Contract time is ONE HUNDRED (100) WORKING DAYS. For bonding purposes, the anticipated Project cost is less than $2,000,000.00

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents