Similar Projects
HVAC and Mechanical Products
Term Contract
Post-Bid

Refrigeration and Cooling Systems Maintenance and Repair
Demolition
Post-Bid
Lexington, KY

Ventilation System
Results
Lexington, KY 40508

Bruce Poundstone Regulatory Service Building - Cooling Tower Replacement
Results
Less than $175,000 est. value
Lexington, KY 40503

C581 VAV Controls Install
Post-Bid
Lexington, KY 40502

Fayette County District Office HVAC
Results
Less than $126,009 est. value
Lexington, KY 40511

HSRB Replace Exhaust Fans
Post-Bid
Lexington, KY 40508

Med Science - MA2 Valve Replacement
Results
Lexington, KY 40536

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

Fleet Services Ventilation Upgrades
Alteration
Results
Lexington, KY 40510

PAV WH Replace AHU 4 and 5 - 2553.0
Infrastructure
Post-Bid
Lexington, KY

Anthropology Building - Collections Area HVAC Upgrades
Alteration
Results
$400,000 est. value
Lexington, KY 40504

BBSRB Penthouse JCI Devices Replacement
Renovation
Results
$100,000 est. value
Lexington, KY

UK-GS A213 Install SPECT-CT
Alteration
Results
$460,000 est. value
Lexington, KY

UKHC PAV H - Replace AHU S1 and S1A - BP-01 Controls
Alteration
Results
$160,000 est. value
Lexington, KY 40506

Last Updated 11/08/2021 02:04 PM
Project Title

Cooling Plant 1 Tower Replacement - Phase III

Physical Address View project details and contacts
City, State (County) Lexington, KY 40502   (Fayette County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Demolish all the remaining old cooling towers, modify all the remaining structural steel, sand blast and paint all the of the remaining existing unpainted steel and new steel installed, install new frp grating and handrails, coordinate installation with owner supplied cooling tower and pipe and wire new tower when installation of tower is complete.

Details

Division 01 - General Requirements.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 09 - Finishes.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents