Similar Projects
Last Updated | 09/08/2020 10:18 AM |
Project Title | Jones Road - Salem Drive Surface Transportation Program Resurfacing |
Physical Address | View project details and contacts |
City, State (County) | Hoffman Estates, IL 60169 (Cook County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Accepting Qualifications, Bidding Expected April 2021 |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The proposed improvements generally consist of grinding the existing pavement and resurfacing with new asphalt. Curb and gutter repairs along with sidewalk modifications to meet ADA requirements are included. New sidewalk is proposed on the east side of Jones Road within the project limits to improve pedestrian access, especially to the junior high school. Shared use lane markings will be added on Jones to help identify the road as part of the Village’s bicycle route system. The existing curb extension for the school crossing at Eisenhower Junior High will be lengthened. In addition, pavement patching, sidewalk repairs to comply with ADA requirements, on-street bicycle lanes, bicycle distance/destination signs, pavement striping, and traffic control signs are included in the scope. Locations: Jones Road – Rosedale Lane to Highland Boulevard. Salem Drive – Bode Road south to Village limits. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |