Last Updated 09/08/2020 10:18 AM
Project Title

Jones Road - Salem Drive Surface Transportation Program Resurfacing

Physical Address View project details and contacts
City, State (County) Hoffman Estates, IL 60169   (Cook County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Accepting Qualifications, Bidding Expected April 2021
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The proposed improvements generally consist of grinding the existing pavement and resurfacing with new asphalt. Curb and gutter repairs along with sidewalk modifications to meet ADA requirements are included. New sidewalk is proposed on the east side of Jones Road within the project limits to improve pedestrian access, especially to the junior high school. Shared use lane markings will be added on Jones to help identify the road as part of the Village’s bicycle route system. The existing curb extension for the school crossing at Eisenhower Junior High will be lengthened. In addition, pavement patching, sidewalk repairs to comply with ADA requirements, on-street bicycle lanes, bicycle distance/destination signs, pavement striping, and traffic control signs are included in the scope. Locations: Jones Road – Rosedale Lane to Highland Boulevard. Salem Drive – Bode Road south to Village limits.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents