Similar Projects
Water Pipe and Main Shut-Off Replacement - General Bids
Infrastructure
Bidding
$118,825 est. value
Winchester, MA 01890

Replacing Water Mains Water Services
Infrastructure
Bidding
$2,900,000 est. value
Wakefield, MA

Furnish and Deliver Water Meters for FY21
Term Contract
Post-Bid
Ayer, MA

Wayland Water Materials
Post-Bid
Wayland, MA

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Supply and Deliver Cold Water Meters - 5/8", 3/4", 11/2" and 2"
Results
Less than $125,000 est. value
Newton, MA

Furnishing and Installation of Ductile Iron Water Main
Post-Bid
$250,000 est. value
Weston, MA

Fox Hill Drive Water and Sewer Project
Results
$1,600,000 est. value
Natick, MA 01760

American Darling Hydrants
Post-Bid
Framingham, MA

Repair and Installation of Sewer/Drain Lines and Water Lines
Term Contract
Results
Less than $3,000,000 est. value
Lowell, MA

2021 Lead Service Line Replacement - Contract Two
Post-Bid
Malden, MA

On-Call Water, Repair Services
Term Contract
Results
Lowell, MA

2021 Lead Service Line Replacement - Contract One
Post-Bid
Malden, MA

Oak Hill Road, Plain Road, and Moore Road Water, Stormwater and Transportation Infrastructure Improvements
Results
Less than $7,700,000 est. value
Westford, MA 01886

Advanced Metering Infrastructure (AMI) Solution
Post-Bid
Groton, MA

Last Updated 04/06/2022 09:18 AM
Project Title

2022 Water Main Replacement

Physical Address View project details and contacts
City, State (County) Bedford, MA   (Middlesex County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,200,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work includes furnishing and installing approximately 3,225 linear feet of 10-inch ductile iron water main on South Road as shown on the project plans. Alternate 1 includes furnishing and installing approximately 1,561 linear feet of 8-inch ductile iron water main on Page Road. The project also includes bypass piping, new copper services, hydrants and gate valves, erosion control, excavation, bituminous patching and other incidental items necessary to complete the required work.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents